Figures of the Article
-
Different particle types at downstream outlet
-
Algorithm procedure of backward erosion piping
-
Geometric conditions of numerical model
-
Piping channel and total head contours at the end of simulation
-
Pressure water heads under different mesh sizes and particle numbers
-
Geometric conditions of sandy soil foundation with cutoff wall
-
Lengths of piping channel under different water heads without cut-off wall
-
Contours of piping channels and total water head of foundation with cut-off wall
-
Pressure water heads on top boundary of foundation with cut-off wall