石头河土石坝的压实

    Earth-rock Dam Compaction in Shitouhe Project

    • 摘要: 本文通过用各种压实机具对石头河土石坝进行压实试验研究,确定了一套适合于机械化施工,并在坝体实际填筑中得到证实的较为合理的压实标准和压实方法。解决了机械化施工中的坝体压实问题,使工程建设在保证质量要求的前提下加快了速度。另外,对8.1t凸块振动碾压实粘土亦进行了一定的试验研究,认为它是一种值得重视和推广的压实机具。

       

      Abstract: Through experiments of compaction on the meterials used in Shitouhe earth-rock dam with various compacting equipments, rational methods and criteria for compaction are found, which are practical and available in mechanized construction and were proved satisfactory through practice. By these, problems concerning compaction in mechanized construction may be solved and the rate of construction may be much quicker.In addition, experiments on compacting clay with a vibrating roller with pads on drum were made also. The conclusion is that such a equipment is available and worthy to be spreaded.

       

    /