• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊

基于Kriging的边坡稳定可靠度主动搜索法

苏永华, 罗正东, 张盼凤, 杨红波

苏永华, 罗正东, 张盼凤, 杨红波. 基于Kriging的边坡稳定可靠度主动搜索法[J]. 岩土工程学报, 2013, 35(10): 1863-1869.
引用本文: 苏永华, 罗正东, 张盼凤, 杨红波. 基于Kriging的边坡稳定可靠度主动搜索法[J]. 岩土工程学报, 2013, 35(10): 1863-1869.
SU Yong-hua, LUO Zheng-dong, ZHANG Pan-feng, YANG Hong-bo. Active searching algorithm for slope stability reliability based on Kriging model[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(10): 1863-1869.
Citation: SU Yong-hua, LUO Zheng-dong, ZHANG Pan-feng, YANG Hong-bo. Active searching algorithm for slope stability reliability based on Kriging model[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(10): 1863-1869.

基于Kriging的边坡稳定可靠度主动搜索法  English Version

基金项目: 国家自然科学基金项目(51078136)
详细信息
    作者简介:

    苏永华(1966- ),男,湖南涟源人,博士后,教授,博士生导师,主要从事边坡及地下结构非确定性及优化设计方面的教学与研究工作。E-mail: yong_su1965@126.com。

  • 中图分类号: TU47

Active searching algorithm for slope stability reliability based on Kriging model

  • 摘要: 边坡等岩土工程的复杂性不仅体现在各类岩土参数的变异性,同时还在于其功能函数模式的隐含性、非解析性甚至未确知性,针对这一特性,以边坡极限平衡模式为范例研究出一种易于执行的边坡工程稳定可靠度直接求解算法。首先,调用边坡极限平衡模式获得岩土基本参数及其对应的边坡稳定系数的适量样本;然后,采用地质统计学中的Kriging各向异性关联映射方法,将边坡功能函数值表达为随机过程并通过样本确定该过程的控制变量,再结合蒙特卡洛模拟与主动学习方法,基于搜索规则调整训练样本,通过迭代循环确定随机过程表示的边坡功能函数所在的最可能失效区域;最后,调用随机过程函数在该区域通过简易的直接计算获得边坡失效概率。工程实例分析与计算结果表明该方法精度与蒙特卡洛海量模拟方法相当,但计算过程直接简易,计算代价低,具有较好的实用性。
    Abstract: The complexity of slope engineering is not only reflected in the variability of geotechnical parameters, but also in the implictic, nonanalytic and unascertain properties of the performance function. In response to these characteristics, based on the limit balance model, a direct solution algorithm for slope stability reliability is introduced. First, the limit balance model for slopes is called to obtain the geotechnical parameters and the samples corresponding to the slope stability factors. Secondly, the Kriging anisotropic dependence mapping method is used to change the performance function into a random process and to determine the control variables of the process. Then combined with the Monte Carlo simulation and active learning method, and based on the searching rules to adjust the training samples, the probable failure zone of the random process is found by iterative loop. Finally, the random process function of the failure zone is called to work out the failure probability of slopes. The case studies and calculated results show that the accuracy of the proposed method is quite similar to that of the Monte Carlo simulation, and it is simpler and more practical.
  • [1] 刘 宁, 邵国建, 王 媛. 地应力渗流共同作用下洞室围岩加锚稳定的可靠度计算[J]. 岩土工程学报, 2000, 22(6): 711-715. (LIU Ning, SHAO Guo-jian, WANG Yuan. Reliability assessment of rockbolt reinforced underground structures influenced by seepage and underground stress field[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(6): 711-715. (in Chinese))
    [2] 苏永华, 李 翔, 丁 云, 等. 基于二次正交试验优化的隧道围岩稳定可靠度方法[J]. 岩土工程学报, 2012, 34(2): 326-332. (SU Yong-hua, LI Xiang, DING Yun, et al. Reliability degree method for stability of surrounding rock of tunnels based on quadratic orthogonal experimental optimization[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(2): 326-332. (in Chinese))
    [3] 李典庆, 蒋水华, 周创兵. 基于非侵入式随机有限元法的地下洞室可靠度分析[J]. 岩土工程学报, 2012, 34(1): 123-129. (LI Dian-qing, JIANG Shui-hua, ZHOU Chuang-bing. Reliability analysis of underground rock caverns using non-intrusive stochastic finite element method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(1): 123-129. (in Chinese))
    [4] 谭晓慧, 王建国. 边坡的弹塑性有限元可靠度分析[J]. 岩土工程学报, 2007, 29(1): 44-50. (TAN Xiao-hui, WANG Jian-guo. Slope reliability analysis using elasto-plastic finite element method[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(1): 44-50. (in Chinese))
    [5] 谭晓慧, 王建国, 吴礼年, 等. 边坡稳定的非线性随机有限元加速收敛算法的研究[J]. 岩土工程学报, 2007, 29(7): 1030-1034. (TAN Xiao-hui, WANG Jian-guo, WU Li-nian, et al. Studies on accelerating convergence method in nonlinear stochastic finite element analysis of slope stability[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(7): 1030-1034. (in Chinese))
    [6] 郑俊杰, 郭 嘉, 李福豪. 基于免疫算法的岩土工程可靠度分析[J]. 岩土工程学报, 2007, 29(5): 785-788. (ZHENG Jun-jie, GUO Jia, LI Fu-hao. Immune algorithm for reliability analysis of geotechnical engineering[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(5): 785-788. (in Chinese))
    [7] 苏国韶, 肖义龙. 边坡可靠度分析的高斯过程方法[J]. 岩土工程学报, 2011, 33(6): 916-920. (SU Guo-shao, XIAO YI-Long. Gaussian process method for slope reliability analysis[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(6): 916-920. (in Chinese))
    [8] 王 宇, 王春磊, 汪 灿, 等. 边坡可靠性评价的向量投影响应面研究及应用[J]. 岩土工程学报, 2011, 33(9): 1434-1439. (WANG Yu, WANG Chun-lei, WANG Can, et al. Reliability evaluation of slopes based on vector projection response surface and its application[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(9): 1434-1439. (in Chinese))
    [9] 李典庆, 唐小松, 周创兵. 含相关非正态变量边坡可靠度分析的认知聚类分区方法[J]. 岩土工程学报, 2011, 33(6): 875-882. (LI Ding-qing, TANG Xiao-song, ZHOU Chuang-bing. Reliability analysis of slope stability involving correlated non-normal variables using knowledge-based clustered partitioning method[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(6): 875-882. (in Chinese))
    [10] 苏永华, 赵明华, 李青海, 等. 稳定性系数为隐式函数的边坡可靠度近似计算方法[J]. 岩土工程学报, 2006, 28(10): 1198-1203. (SU Yong-hua, ZHAO Ming-hua, LI Qing-hai, et al. Approximative method to calculate reliability of slope with stability coefficient to be implicit expression [J]. Chinese Journal of Geotechnical Engineering, 2006, 28(10): 1198-1203. (in Chinese))
    [11] KRISHNAMURTHY T. Comparison of response surface construction methods for derivative estimation using moving least squares, Kriging and radial basis functions[R]. Austin: American Institute of Aeronautics and Astronautics, 2005.
    [12] GOMES H M, AWRUCH A M. Comparison of response surface and neural network with other methods for structural reliability analysis[J]. Structural Safety, 2004, 26(1): 49-57.
    [13] 赵洪波. 基于支持向量机的边坡可靠度分析[J]. 岩土工程学报, 2007, 29(6): 819-823. (ZHAO Hong-bo. Reliability analysis of slope based on support vector machine[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(6): 819-823. (in Chinese))
    [14] CHERKASSKY V, MA Y. Practical selection of SVM parameters and noise estimation for SVM regression[J]. Neural Networks, 2004, 17(1): 113-126.
    [15] KAYMAZ I. Application of kriging method to structural reliability problems[J]. Structural Safety, 2005, 27(2): 133-151.
    [16] 张 崎, 李兴斯. 结构可靠性分析的模拟重要抽样方法[J]. 工程力学, 2007, 24(1): 33-36. (ZHANG Qi, LI Xing-si. Importance sampling approach in structural reliability analysis based on kriging simulation[J]. Engineering Mechanics, 2007, 24(1): 33-36. (in Chinese))
    [17] 谢延敏, 于沪平, 陈 军, 等. 基于Kriging模型的可靠度计算[J]. 上海交通大学学报, 2007, 41(2): 177-180. (XIE Yan-min, YU Hu-ping, CHEN Jun, et al. The reliability estimation based on kriging model[J]. Journal of Shanghai Jiaotong University, 2007, 41(2): 177-180. (in Chinese))
    [18] ECHARD B, GAYTON N, LEMAIRE M. AK-MCS: An active learning reliability method combining Kriging and MonteCarlo Simulation[J]. Structural Safety, 2011, 33(2): 145-154.
    [19] SOREN N Lophaven, HANS Bruun Nielsen, JACOB Sondergaard. Aspects of the matlab toolbox DACE[C]// Report IMM-TR-2002-12, Informatics and Mathematical Modelling[DB/OL]. Lyngby: Technical University of Denmark, 2002.
    [20] 贡金鑫. 工程结构可靠度计算方法[M]. 大连: 大连理工大学出版社, 2003. (GONG Jin-xin. Calculation method for reliability degree of engineering structure[M]. Dalian: Press of Dalian Technology University, 2003. (in Chinese))
计量
  • 文章访问数: 
  • HTML全文浏览量:  0
  • PDF下载量: 
  • 被引次数: 0
出版历程
  • 收稿日期:  2013-01-04
  • 发布日期:  2013-10-19

目录

    /

    返回文章
    返回