Key construction techniques for oversized excavation pits using top-down method
-
摘要: 上海陆家嘴塘东中块总部基地基坑工程采用了地下结构框架梁柱作为基坑的支撑,墙体和楼板顺做的框架逆作法,是该地区很有特色的工程案例。主要介绍了该工程设计施工的两项关键技术,包括盆式和分层分块平衡对称抽条开挖和逆作法主要施工节点处理、不均匀沉降控制等,为类似工程起到了示范作用。Abstract: The deep foundation pit of the headquarter base of Tangdong central block in Lujiazui of Shanghai is constructed by use of the top-down method. It is a very distinctive engineering case in this area. Some key design and construction techniques are introduced. They include rational planning of soil excavation, treatment of critical construction nodes and control of uneven settlement, etc. The success of this case may provide engineering experience for similar projects.
-
Keywords:
- oversized excavation pit /
- top-down method /
- construction technique
-
刘国彬,王卫东. 基坑工程手册[M]. 2版.北京:中国建筑工业出版社, 2009.(LIU Guo-bin,WANG Wei-dong. Excavation engineering manual[M]. 2nd.Beijing:China Architecture & Building Press, 2009. (in Chinese))
叶可明,王允恭,李定江. 上海高层建筑多层地下室逆作法施工技术[J]. (建筑施工), 1998(5): 2-7.(YE Ke-ming,WANG Yun-gong,LI Ding-jiang. Up-side-down construction technology adopted for multistory basement of highrise building in shanghai[J]. Building Construction, 1998(5): 2-7. (in Chinese))
石震东. 逆作法工程中主要施工节点的处理[J]. (建筑施工), 2006, 28(7): 522-523.(SHI Zhen-dong. Treatment of critical construction nodes for project executed with reserved construction method[J]. Building Construction, 2006, 28(7): 522-523. (in Chinese))
王美华,季 方. 超大面积深基坑逆作法施工技术的探讨[J]. (地下空间与工程学报), 2005(4): 599-602.(WANG Mei-hua,JI Fang. discussion on the construction techniques of oversized excavation pit constructed by top-down method[J]. Underground Space, 2005(4): 599-602. (in Chinese))
盛春陵,李仁民,王守超,等. 逆作法中立柱调垂方法探讨[J]. (岩土工程学报), 2012, 34: 595-597.(SHENG Chun-ling,LI Ren-min,WANG Shou-chao,et al. Vertical adjustment method for soldier piles in top-down projects[J]. Chinese Journal of Geotechnical Engineering, 2012, 34: 595-597. (in Chinese))