浅埋大跨连拱隧道施工中变形的监测与控制措施

    刘招伟, 何满潮, 肖红渠

    刘招伟, 何满潮, 肖红渠. 浅埋大跨连拱隧道施工中变形的监测与控制措施[J]. 岩土工程学报, 2003, 25(3): 339-342.
    引用本文: 刘招伟, 何满潮, 肖红渠. 浅埋大跨连拱隧道施工中变形的监测与控制措施[J]. 岩土工程学报, 2003, 25(3): 339-342.
    LIU Zhaowei, HE Manchao, XIAO Hongqu. Deformation monitoring and control measures of shallow large-span duel-linked arch tunnel[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(3): 339-342.
    Citation: LIU Zhaowei, HE Manchao, XIAO Hongqu. Deformation monitoring and control measures of shallow large-span duel-linked arch tunnel[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(3): 339-342.

    浅埋大跨连拱隧道施工中变形的监测与控制措施  English Version

    Deformation monitoring and control measures of shallow large-span duel-linked arch tunnel

    • 摘要: 详细介绍了京珠高速公路某双连拱隧道采用三导洞超前法施工过程中变形的现场监测结果与分析 ,提出了抑制变形的工程措施 ,对后续工程施工具有指导意义。
      Abstract: This paper introduces in detail the monitored deformation and its analysis in a duel linked arch tunnel located in Jing Zhu expressway ,and points out the engineering measures to repress the deformation.The conclusions is instructive for the future engineering construction.
    计量
    • 文章访问数:  1209
    • HTML全文浏览量:  5
    • PDF下载量:  577
    • 被引次数: 0
    出版历程
    • 发布日期:  2003-05-22

    目录

      XIAO Hongqu

      1. On this Site
      2. On Google Scholar
      3. On PubMed

      /

      返回文章
      返回