止水帷幕渗漏条件下基坑降水过程中地层水头计算方法

    Method for calculating water head of formation during dewatering of foundation pits under leakage of waterproof curtain

    • 摘要: 止水帷幕渗漏水会改变地层渗流场分布,是诱发基坑灾害发生的重要因素,开展止水帷幕渗透条件下基坑降水过程中周围地层水头计算方法研究具有重要意义。考虑止水帷幕渗漏对地下水渗流的影响,将基坑土层假定为双层地基,基于太沙基一维固结理论,推导得到了不同位置处地下水渗流控制方程。结合渗漏处和止水帷幕底部渗流连续条件推导得到了降水过程中地层水头计算方法,并开展室内试验验证了其准确性。成果可为止水帷幕渗漏条件下基坑降水过程中地层水头计算提供参考。

       

      Abstract: The leakage of water from the waterproof curtain will change the distribution of the seepage field and is an important factor in inducing disasters in foundation pit engineering. It is of great scientific significance to develop a method for calculating the water head of the surrounding strata during the dewatering process of foundation pits under leakage of waterproof curtain. Considering the influences of the leakage position of the waterproof curtain on the seepage process of groundwater level, the soil layer of the foundation pit is assumed to be a double-layer foundation. Based on the one-dimensional consolidation theory, the control equations for groundwater seepage at different positions are derived. A method for calculating the water head of formation during precipitation is derived based on the continuous conditions of seepage at the leakage point and the bottom of the waterproof curtain. The accuracy of the theoretical method is verified through the indoor experiments. The results can provide reference for the calculation of water head of formation during the dewatering process of foundation pits under leakage of waterproof curtain.

       

    /

    返回文章
    返回