Dynamic response of different connection forms of mechanical connection tunnels under train loads
-
摘要: 机械法联络通道作为一种新型施工工艺,接头处的连接形式采用钢板焊接而成,焊接工艺在动力荷载作用下容易产生疲劳损伤破坏。针对接头处的问题,通过有限元模拟研究了列车荷载对于不同连接形式下主隧道与联络通道上的加速度响应及位移响应情况。研究结果表明:对于位移响应半刚性连接形式下接头能吸收一部分位移传递,有利于隧道整体结构的安全,刚性接头则整体性较强,位移不会出现突然骤减的情况;半刚性接头能削弱加速度的传递,而刚性接头整体性强,对加速传递效率高。Abstract: As a new type of construction process, the mechanical connection channel is welded by steel plate, and the welding process is prone to fatigue damage under dynamic loads. According to the problem of the joint, the acceleration response, displacement response and communication channel under different connection modes are studied by using the finite element simulation. For the displacement response semi-rigid connection, the joint can absorb part of the displacement transmission, which is beneficial to the safety of the overall structure of the tunnel. The rigid joint is more integral and the displacement does not suddenly drop. The semi-rigid joint can weaken the transmission of acceleration, while the rigidity of the rigid joint is strong, and the acceleration transmission efficiency is high.
-
Keywords:
- train load /
- connection form /
- contact channel /
- finite element simulation /
- joint
-
[1] 卢渝, 金辰虎. 我国城市轨道交通的建设与展望[J]. 铁道运输与经济, 2004, 26(5): 21-23.
(LU Yu, JIN Chen-hu.The construction and prospect of China urban mass transit[J]. Chinese Journal of Railway Transport and Economy, 2004, 26(5): 21-23. (in Chinese))[2] SHEN H J.Finite element analysis of structure-born vibration from high-speed train[J]. Chinese Journal of Soil Dynamics and Earthquake Engineering, 2007, 27: 259-273. [3] AUERSCH L.The excitation of ground vibration by rail traffic: theory of vehicle-track-soil interaction and measurements on high-speed lines[J]. Chinese Journal of Sound and Vibration, 2005, 28(4): 103-132. [4] VROUWENVELDER T.Stochastic modelling of extreme action events in structural engineering[J]. Probabilistic Engineering Mechanics, 2000, 15(1): 109-117. [5] 曾丰姿, 李兆平, 刘军. 区间盾构隧道联络道施工对隧道结构和周围地层安全性影响的研究[J]. 中国安全科学学报, 2006, 16(3): 93-97, 147.
(ZENG Feng-zi, LI Zhao-ping, LIU Jun.Study on safety of tunnels structure and stratum stability in construction of traverse channel between two shield tunnels[J]. Chinese Journal of China Safety Science Journal, 2006, 16(3): 93-97, 147. (in Chinese))[6] 梁发云, 贾亚杰, 丁钰津, 等. 上海地区软土HSS模型参数的试验研究[J]. 岩土工程学报, 2017, 39(2): 269-278.
(LIANG Fa-yun, JIA Ya-jie, DING Yu-jin, et al.Experimental study on parameters of HSS model for soft soils in Shanghai[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(2): 269-278. (in Chinese))[7] LEE K M, GE X M.The equivalence of a jointed shield driven tunnel lining to a continuous ring structure[J]. Canadian Geotechnical Journal, 2001, 38: 461-483.