Behavior of retaining wall during dewatering before soil excavation under layout of staggered wells
-
摘要: 基坑开挖前预降水是富水地层中深基坑施工的一项重要施工步骤,其引起的围护结构及周边地层变形可以达到cm级。然而,传统基坑设计理论与相关研究未提出基坑预降水引发基坑变形的控制方法。本文提出了一种降水井错位布置的方法用于控制预降水引起的围护结构变形,指出可使距离围护结构越近的降水井相对越深、相邻降水井间距相对越小。数值计算结果表明,这种方法相对于常规抽水方式(等间距等长布置降水井,同时或随意开启)而言,可以改变预降水过程中坑内渗流场分布,使得在围护结构附近出现指向围护结构的渗流迹线,从而限制了预降水过程中背离围护结构的坑内土体水平位移的发展,最终起到减小围护结构侧移的作用。若合理地对降水井进行错位布置,可较大程度限制基坑预降水引发围护结构的侧移。Abstract: The dewatering conducted before soil excavation is an important stage in deep excavation. This dewatering construction is proved to be able to induce considerable deflection of retaining wall. However, how to control this type of deformation has not been proposed. A method called layout of staggered wells is proposed to control the dewatering-caused wall deformation. In this method, the uniformly-spaced and uniformly-buried layout of wells (i.e., the conventional layout of dewatering wells in practical engineering) is not advocated. It is recommended that (1) deeper wells should be employed near the retaining structures, and when the distance to the retaining structures increases, the wells depth should decrease gradually, and (2) smaller spacings of neighboring wells should adopted near the retaining structures, and when the distance to the retaining structures increases, the spacings of neighboring wells increase gradually. The numerical results show that the proposed method can lead to a smaller seepage flow velocity around the wall. Hence, the horizontal deformation of soil induced by seepage force will be relatively smaller, which eventually limit the deformation development of the retaining structures.
-
Keywords:
- deep excavation /
- wall deflection /
- dewatering /
- well layout /
- numerical simulation
-
[1] ZENG C F, XUE X L, ZHENG G, et al.Responses of retaining wall and surrounding ground to pre-excavation dewatering in an alternated multi-aquifer-aquitard system[J]. Journal of Hydrology, 2018, 559: 609-626. [2] 郑刚, 曾超峰. 基坑开挖前潜水降水引起的地下连续墙侧移研究[J]. 岩土工程学报, 2013, 35(12): 2153-2163.
(ZHENG Gang, ZENG Chao-feng.Lateral displacement of diaphragm wall by dewatering of phreatic water before excavation[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(12): 2153-2163. (in Chinese))[3] 曾超峰, 郑刚, 薛秀丽. 大面积基坑开挖前预降水对支护墙变形的影响研究[J]. 岩土工程学报, 2017, 39(6): 1012-1021.
(ZENG Chao-feng, ZHENG Gang, XUE-Xiu-li.Study ofwall deflection induced by pre-excavation dewatering inlarge-scale excavation[J]. Chinese Journal ofGeotechnical Engineering, 2017, 39(6): 1012-1021. (in Chinese))[4] ZHENG G, ZENG C F, DIAO Y, et al.Test and numerical research on wall deflections induced by pre-excavation dewatering[J]. Computers and Geotechnics, 2014, 62: 244-256. [5] 曾超峰, 薛秀丽, 郑刚. 软土地基渗透性条件对基坑预降水过程中支护墙侧移的影响研究[J]. 岩土力学, 2017, 38(10): 3039-3047.
(ZENG Chao-feng, XUE Xiu-li, ZHENG Gang.Effect of soil permeability on wall deflection during pre-excavation dewatering in soft ground[J]. Rock and Soil Mechanics, 2017, 38(10): 3039-3047. (in Chinese))[6] 曾超峰, 薛秀丽, 郑刚. 软土区基坑预降水引起支护墙侧移的典型参数影响研究[J]. 岩土力学, 2017, 38(11): 3295-3303, 3318.
(ZENG Chao-feng, XUE Xiu-li, ZHENG Gang.A parametric study of lateral displacement of support wall induced by foundation pre-dewatering in soft ground[J]. Rock and Soil Mechanics, 2017, 38(11): 3295-3303, 3318. (in Chinese)) -
期刊类型引用(4)
1. 唐小平,邓良平,汪建海,梁榆峰,江杰,叶耿昌. 排水管道土压力数值分析及非开挖修复内衬管壁厚优化. 给水排水. 2024(02): 139-145 . 百度学术
2. 张常光,吴凯,孟祥忠,王晓轮. 稳态渗流下非饱和土涵洞竖向土压力的迭代解与简化. 哈尔滨工业大学学报. 2024(03): 68-77 . 百度学术
3. 于金弘,伍鹤皋,石长征,孙海清,汪碧飞,李娇娜. 考虑管道自重荷载的埋地钢管结构计算方法. 长江科学院院报. 2024(05): 155-161 . 百度学术
4. 朱珍锋,韩高孝. 沟埋式管道垂直土压力模拟试验研究. 水利与建筑工程学报. 2024(03): 99-106 . 百度学术
其他类型引用(1)