[1] |
郑颖人, 朱合华, 方正昌, 等. 地下工程围岩稳定分析与设计理论[M]. 北京: 人民交通出版社, 2012. (ZHENG Ying-ren, ZHU He-hua, FANG Zheng-chang, et al. The stability analysis and design theory of surrounding rock of underground engineering[M]. Beijing: China Communications Press, 2012. (in Chinese))
|
[2] |
王思敬, 杨志法, 刘竹华. 地下工程岩体稳定分析[M]. 北京: 科学出版社, 1984. (WANG Si-jing, YANG Zhi-fa, LIU Zhu-hua. Stability analysis of rock mass for underground engineering[M]. Beijing: Science Press, 1984. (in Chinese))
|
[3] |
BIENIAWSKI T Z. Engineering classification of jointed rock masses[J]. Civil Engineer in South Africa, 1973, 15(12): 335-343.
|
[4] |
HOEK E, BROWN E T. Practical estimates of rock mass strength[J]. International Journal of Rock Mechanics and Mining Sciences, 1997, 34(8): 1165-1186.
|
[5] |
SONMEZ H, ULUSAY R. Modifications to the geological strength index (GSI) and their applicability to stability of slopes[J]. International Journal of Rock Mechanics and Mining Sciences, 1999, 36(6): 743-760.
|
[6] |
BARTON N, LIEN R, LUNDE J. Engineering classification of rock masses for the design of tunnel support[J]. Rock Mechanics and Rock Engineering, 1974, 6(4): 189-236.
|
[7] |
GB/T 50218—2014工程岩体分级标准[S]. 2014. (GB/T 50218—2014 Standard for engineering classification of rock masses[S]. 2014. (in Chinese))
|
[8] |
喻 勇, 尹健民, 杨火平, 等. 岩体分级方法在水布垭地下厂房工程中的应用[J]. 岩石力学与工程学报, 2004, 23(10): 1706-1709. (YU Yong, YIN Jian-min, YANG Huo-ping, et al. Rock mass classification for underground power houses of Shuibuya project[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(10): 1706-1709. (in Chinese))
|
[9] |
孙金山, 卢文波, 苏利军, 等. 基于TBM掘进参数和渣料特征的岩体质量指标辨识[J]. 岩土工程学报, 2008, 30(12): 1847-1854. (SUN Jin-shan, LU Wen-bo, SU Li-jun, et al. Rock mass rating identification based on TBM performance parameters and muck characteristics[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(12): 1847-1854. (in Chinese))
|
[10] |
冯兴隆, 王李管, 毕 林. 矿体可崩性区域化评价模型研究[J]. 岩土工程学报, 2009, 31(4): 584-588. (FENG Xing-long, WANG Li-guan, BI Lin. Compartmentation cavability evaluation model of ore body[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 584-588. (in Chinese))
|
[11] |
曹 平, 张 科, 万琳辉, 等. 金川矿山深部采掘条件下岩石力学研究与实践[J]. 岩石力学与工程学报, 2012, 31(7): 1334-1341. (CAO Ping, ZHANG Ke, WAN Lin-hui, et al. Study and practice of rock mechanics in Jinchuan mine under deep exploitation[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(7): 1334-1341. (in Chinese))
|
[12] |
CELADA B, TARDÁGUILA I, BIENIAWSKI Z T. Innovating tunnel design by an improved experience-based RMR system[C]// Proceedings of the World Tunnel Congress 2014. Foz do Iguaçu, 2014.
|
[13] |
KANIK M, GUROCAK Z, ALEMDAG S. A comparison of support systems obtained from the RMR89 and RMR14 by numerical analyses: Macka Tunnel project, NE Turkey[J]. Journal of African Earth Sciences, 2015, 109: 224-238.
|
[14] |
陶振宇, 彭祖赠. 模糊数学在岩石工程分类中的应用[J]. 岩土工程学报, 1981, 3(1): 36-45. (TAO Zhen-yu, PENG Zu-zeng. Application of fuzzy mathematics to the engineering classification of rocks[J]. Chinese Journal of Geotechnical Engineering, 1981, 3(1): 36-45. (in Chinese))
|
[15] |
王广军, 苏经宇. 场地类别的模糊综合评判[J]. 地震工程与工程振动, 1985, 2: 28-42. (WANG Guang-jun, SU Jing-yu. Fuzzy synthetic evaluation of site classification[J]. Earthquake Engineering and Engineering Vibration, 1985, 2: 28-42. (in Chinese))
|
[16] |
王元汉, 李卧东, 李启光, 等. 岩爆预测的模糊数学综合评判方法[J]. 岩石力学与工程学报, 1998, 17(5): 493-501. (WANG Yuan-han, LI Wo-dong, LI Qi-guang, et al. Method of fuzzy comprehensive evaluations for rock burst prediction[J]. Chinese Journal of Rock Mechanics and Engineering, 1998, 17(5): 493-501. (in Chinese))
|
[17] |
祁生文, 伍法权. 基于模糊数学的TBM施工岩体质量分级研究[J]. 岩石力学与工程学报, 2011, 30(6): 1225-1229. (QI Sheng-wen, WU Fa-quan. Surrounding rockmass quality classification of tunnel cut by TBM with fuzzy mathematics method[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(6): 1225-1229. (in Chinese))
|
[18] |
MAMDANI E H, ASSILIAN S. An experiment in linguistic synthesis with a fuzzy logic controller[J]. International Journal of Human-Computer Studies, 1999, 51(2): 135-147.
|
[19] |
LOWSON A R, BIENIAWSKI Z T. Critical assessment of RMR based tunnel design practices: a practical engineer’s approach[C]// Rapid Excavation and Tunneling Conference 2013. Washington D C, 2013.
|
[20] |
HAMIDI J K, SHAHRIAR K, REZAI B, et al. Application of fuzzy set theory to rock engineering classification systems: an illustration of the rock mass excavability index[J]. Rock Mechanics and Rock Engineering, 2010, 43(3): 335-350.
|
[21] |
BERKAN R C, TRUBATCH S L. Fuzzy system design principles: building fuzzy if-then rule bases[M]. New York: The Institute of Electrical and Electronics Engineers, 1997.
|
[22] |
同济大学. 独平高速隧道掌子面节理特征精细化描述及优势节理面[R]. 上海: 同济大学, 2013. (Tongji University. Duping high speed Fine description of tunnel face joint characteristics and dominant joint surfaces[R]. Shanghai: Tongji University, 2013. (in Chinese))
|
[23] |
许宏发, 陈 锋, 王 斌, 等. 岩体分级BQ与RMR的关系及其力学参数估计[J]. 岩土工程学报, 2014, 36(1): 195-198. (XU Hong-fa, CHEN Feng, WANG Bin, et al. Relationship between RMR and BQ for rock mass classification and estimation of its mechanical parameters[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(1): 195-198. (in Chinese))
|