悬臂排桩支护基坑沿长度方向连续破坏的机理试验研究

程雪松, 郑刚, 黄天明, 邓楚涵, 聂东清, 刘杰

程雪松, 郑刚, 黄天明, 邓楚涵, 聂东清, 刘杰. 悬臂排桩支护基坑沿长度方向连续破坏的机理试验研究[J]. 岩土工程学报, 2016, 38(9): 1640-1649. DOI: 10.11779/CJGE201609011
引用本文: 程雪松, 郑刚, 黄天明, 邓楚涵, 聂东清, 刘杰. 悬臂排桩支护基坑沿长度方向连续破坏的机理试验研究[J]. 岩土工程学报, 2016, 38(9): 1640-1649. DOI: 10.11779/CJGE201609011
CHENG Xue-song, ZHENG Gang, HUANG Tian-ming, DENG Chu-han, NIE Dong-qing, LIU Jie. Experimental study on mechanism of progressive collapse along length of excavation retained by cantilever contiguous piles[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(9): 1640-1649. DOI: 10.11779/CJGE201609011
Citation: CHENG Xue-song, ZHENG Gang, HUANG Tian-ming, DENG Chu-han, NIE Dong-qing, LIU Jie. Experimental study on mechanism of progressive collapse along length of excavation retained by cantilever contiguous piles[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(9): 1640-1649. DOI: 10.11779/CJGE201609011

悬臂排桩支护基坑沿长度方向连续破坏的机理试验研究  English Version

基金项目: 国家科技支撑计划课题项目(2012BAJ01B02-03); 中国博士后科学基金项目(2014M561186)
详细信息
    作者简介:

    程雪松(1985- ),男,河北人,博士,博士后,从事基坑工程及地下工程稳定性的研究工作。E-mail:cheng_xuesong@163.com。

  • 中图分类号: TU473

Experimental study on mechanism of progressive collapse along length of excavation retained by cantilever contiguous piles

  • 摘要: 大长度基坑发生了一些沿长度方向上由局部破坏引发数10 m至100 m以上的连续破坏事故,然而基坑连续破坏的发生及终止机理却少有研究。设计了悬臂排桩支护基坑局部支护桩破坏倒塌的模型试验,对局部破坏引发的土压力和支护结构内力变化等规律等进行了研究,在此基础上进行了局部破坏引发支护桩连续破坏的试验。结果表明,基坑局部垮塌会引起邻近桩的土压力和桩身内力瞬间增大,随后坑外土体滑塌进基坑内,造成邻近支护结构主动区卸载,但此卸荷过程相对滞后。当局部垮塌引发的荷载传递系数大于邻近桩的承载力安全系数时,将会导致基坑连续破坏。连续破坏发生后,随着破坏范围增大,土体滑塌引发的卸荷使得土拱效应不足以继续导致支护桩出现破坏时,连续破坏将自然终止。试验还表明,在一定局部破坏长度范围内,局部垮塌长度越大,荷载传递系数和影响范围越大;围护桩嵌固深度越小,即支护桩抗侧移刚度越低时,荷载传递系数越小,但局部破坏影响范围较大。
    Abstract: Progressive collapse of deep excavations along the longitudinal direction induced by partial failure may extend to tens of meters or even more than one hundred meters. However, the researches on the initiation and termination mechanism of progressive collapse are limited. The model tests on partial collapse caused by the breakage of some retaining piles are designed. The changing rules of earth pressures and internal forces of adjacent piles are analyzed. Furthermore, the model tests on progressive collapse induced by partial collapse are conducted. The test results show that the partial collapse can cause sudden increase of earth pressures and structural internal forces of adjacent piles. Afterwards, the soil outside the excavation flows into the excavation, which is an unloading effect for the adjacent piles. However, the unloading effect lags behind the loading effect. If the load transfer coefficient of partial collapse is larger than the safety factor of bearing capacity of the adjacent piles, the progressive collapse will occur. During the process of progressive collapse, when the soil arching effect is mitigated by the unloading effect and cannot cause further breakage of the retaining structures, the progressive collapse ceases naturally. Within a certain extent, the larger the partial collapse is, the larger the load transfer coefficient and the influenced area are. Additionally, when the lateral stiffness of piles is low, the load transfer coefficient will be small, but the influenced area will be large.
  • [1] 郑 刚, 程雪松, 张 雁. 基坑环梁支撑结构的连续破坏模拟及冗余度研究[J]. 岩土工程学报, 2014, 36(1): 105-117. (ZHENG Gang, CHENG Xue-song, ZHANG Yan. Progressive collapse simulation and redundancy study of ring-beam supporting structures of excavations[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(1): 105-117. (in Chinese))
    [2] ZHENG G, CHENG X S, DIAO Y, et al. Concept and design methodology of redundancy in braced excavation and case histories[J]. Geotechnical Engineering Journal of the SEAGS & AGSSEA, 2011, 42(3): 13-21.
    [3] 郑 刚, 程雪松, 刁 钰. 基坑垮塌的离散元模拟及冗余度分析[J]. 岩土力学, 2014, 35(2): 573-583. (ZHENG Gang, CHENG Xue-song, DIAO Yu. DEM simulation and redundancy analysis of excavation collapse[J]. Rock and Soil Mechanics, 2014, 35(2): 573-583. (in Chinese))
    [4] HAACK A. Construction of the north-south-metro line in Cologne and the accident on March 3rd, 2009[C]// International Symposium on Social Management Systems (SSMS). 2009.
    [5] 李广信, 李学梅. 软黏土地基中基坑稳定分析中的强度指标[J]. 工程勘察, 2010(1): 1-4. (LI Guang-xin, LI Xue-mei. The shear strength in stability analysis of subway pit in soft clay[J]. Geotechnical Investigation & Surveying, 2010(1): 1-4. (in Chinese))
    [6] 张旷成, 李继民. 杭州地铁湘湖站“08.11.15”基坑坍塌事故分析[J]. 岩土工程学报, 2010, 32(增刊1): 338-342. (ZHANG Kuang-cheng, LI Ji-min. Accident analysis for ‘08.11.15’ foundation pit collapse of Xianghu Station of Hangzhou metro[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 338-342. (in Chinese))
    [7] COI(2005). Report of the Committee of Inquiry into the incident at the MRT circle line worksite that led to collapse of Nicoll Highway on 20 April 2004[R]. Singapore: Ministry of Manpower, 2004.
    [8] ARTOLA J. A solution to the braced excavation collapse in Singapore (Master thesis)[D]. Boston: Massachusetts Institute of Technology, 2005.
    [9] WHITTLE A J, DAVIES R V. Nicoll Highway collapse: evaluation of geotechnical factors affecting design of excavation support system[C]// International Conference on Deep Excavations. Singapore, 2006.
    [10] 黄茂松, 宋晓宇, 秦会来. K 0 固结黏土基坑抗隆起稳定性上限分析[J]. 岩土工程学报, 2008, 30(2): 250-255. (HUANG Mao-song, SONG Xiao-yu, QIN Hui-lai. Basal stability of braced excavations in K 0 -consolidated soft clay by upper bound method[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(2): 250-255. (in Chinese))
    [11] BJERRUM L, EIDE O.Stability of strutted excavations in clay[J]. Géotechnique, 1956, 6(1): 32-47.
    [12] 刘建航, 侯学渊. 基坑工程手册[M].北京: 中国建筑工业出版社, 1997. (LIU Jian-hang, HOU Xue-yuan. Excavations engineering manual[M]. Beijing: China Architecture and Building Press, 1997. (in Chinese))
    [13] DG/TJ08—61—2010 J11575—2010 基坑工程技术规范(上海)[S]. 上海, 2010. (DG/TJ08—61—2010 J11575—2010 Technical code for design of excavation engineering[S]. Shanghai, 2010. (in Chinese))
    [14] CHANG M. Basal stability analysis of braced cuts in clay[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2000, 126(3): 276-279.
    [15] 刘国彬, 王卫东. 基坑工程手册[M]. 2版. 北京: 中国建筑工业出版社, 200: 121-146. (LIU Guo-bin, WANG Wei-dong. Excavations engineering manual[M]. 2nd ed. Beijing: China Architecture and Building Press, 2009: 121-146. (in Chinese))
    [16] 章杨松, 陈新民. 多支撑挡墙边坡稳定性的强度参数折减有限元分析[J].岩土工程学报, 2006, 28(11): 1952-1956. (ZHANG Yang-song, CHEN Xin-min. Finite element analysis for slope stability with multi-braced retaining wall through reduction of strength parameters[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(11): 1952-1957. (in Chinese))
    [17] HSIEN P G, OU C Y, LIU H T. Basal heave analysis of excavations with consideration of anisotropic undrained strength of clay[J]. Can Geotech J, 2008, 45: 788-799.
    [18] UKRITCHON B, WHITTLE A J, SLOAN S W. Undrained stability of braced excavations in clay[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2003, 8: 738-755.
    [19] 程雪松, 郑 刚, 邓楚涵, 等. 基坑悬臂排桩支护局部失效引发连续破坏机理研究[J]. 岩土工程学报, 2015, 37(7): 1249-1263. (CHENG Xue-song, ZHENG Gang, DENG Chu-han et al. Study of the mechanism of progressive collapse induced by partial failure of cantilever contiguous retaining piles[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(7): 1249-1263. (in Chinese))
    [20] JGJ120—2012 建筑基坑支护技术规程[S]. 北京: 中国建筑工业出版社, 2012. (JGJ120—2012 Technical specification for retaining and protection of building foundation excavations[S]. Beijing: China Architecture and Building Press, 2012. (in Chinese))
计量
  • 文章访问数: 
  • HTML全文浏览量:  0
  • PDF下载量: 
  • 被引次数: 0
出版历程
  • 收稿日期:  2015-06-25
  • 发布日期:  2016-09-24