基坑悬臂排桩支护局部失效引发连续破坏机理研究

程雪松, 郑刚, 邓楚涵, 黄天明, 聂东清

程雪松, 郑刚, 邓楚涵, 黄天明, 聂东清. 基坑悬臂排桩支护局部失效引发连续破坏机理研究[J]. 岩土工程学报, 2015, 37(7): 1249-1263. DOI: 10.11779/CJGE201507011
引用本文: 程雪松, 郑刚, 邓楚涵, 黄天明, 聂东清. 基坑悬臂排桩支护局部失效引发连续破坏机理研究[J]. 岩土工程学报, 2015, 37(7): 1249-1263. DOI: 10.11779/CJGE201507011
CHENG Xue-song, ZHENG Gang, DENG Chu-han, HUANG Tian-ming, NIE Dong-qing. Mechanism of progressive collapse induced by partial failure of cantilever contiguous retaining piles[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(7): 1249-1263. DOI: 10.11779/CJGE201507011
Citation: CHENG Xue-song, ZHENG Gang, DENG Chu-han, HUANG Tian-ming, NIE Dong-qing. Mechanism of progressive collapse induced by partial failure of cantilever contiguous retaining piles[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(7): 1249-1263. DOI: 10.11779/CJGE201507011

基坑悬臂排桩支护局部失效引发连续破坏机理研究  English Version

基金项目: 国家科技支撑计划课题(2012BAJ01B02-03); 国家重点基础研究发展计划(“973”计划)项目(2010CB732106); 中国博士后科学基金项目(2014M561186)
详细信息
    作者简介:

    程雪松(1985- ),男,河北人,博士后,从事基坑工程及地下工程稳定性的研究工作。E-mail: cheng_xuesong@163.com。

Mechanism of progressive collapse induced by partial failure of cantilever contiguous retaining piles

  • 摘要: 虽然已有很多基坑连续倒塌破坏的工程案例,局部破坏可能导致的连续垮塌规模和造成的后果也越来越大,但是由局部破坏发展为大规模连续破坏的机理还少有研究,也缺乏针对基坑连续破坏的控制方法和设计理论。以排桩支护的长条形基坑为例,采用显式有限差分法、离散元法及模型试验对局部支护结构失效情况下的基坑进行了模拟,对基坑土压力的重分布和支护结构受力的变化规律进行了分析和相互对比验证,初步揭示了连续破坏在基坑长度方向上的传递机理,提出了荷载传递系数的概念,即临近破坏第一根桩内力的提高倍数,并发现其是决定基坑是否发生连续破坏的重要因素。土体强度越高,荷载传递系数越高。在局部破坏发生之后很短时间内,未破坏部位土压力和结构受力迅速升高达到最大值。排桩顶设置的连续冠梁可以降低传递系数,对提高基坑支护结构抗连续破坏能力有重要作用。
    Abstract: Although there are many progressive collapse cases of deep excavations and the scale of progressive collapse caused by the initial partial failure of the retaining structures and its consequences are becoming larger and larger, the researches on the mechanism how the partial failure evolves to large-scale progressive collapse are still limited, and the control methods and design theories of progressive collapse haven't been developed. In this study, the long strip excavation with cantilever contiguous retaining piles under partial failure is simulated by the explicit finite difference method, discrete element method and model tests. The redistribution of soil pressures and change of internal forces of the retaining structures are analyzed and compared using the simulated results, and then the transfer mechanism of progressive collapse in the longitudinal direction of the excavation is preliminarily revealed. The concept of load transfer coefficient is raised, which equals to the increment ratio of the internal force of the piles adjacent to the partial failure, and it is found that the load transfer coefficient is a crucial factor which can determine whether or not the progressive collapse can happen. For a retaining structure, the higher the soil strength is, the larger the load transfer coefficient is. When partial failure occurs, soil pressures and internal forces of adjacent intact retaining structures increase rapidly. The continuous top-beam installed on the top of piles can lower the load transfer coefficient, and plays an important role in increasing the capacity of retaining structures to resist progressive collapse.
  • [1] COI. Report of the Committee of Inquiry into the incident at the MRT circle line worksite that led to collapse of Nicoll Highway on 20 April 2004[R]. Singapore: Ministry of Manpower, 2005.
    [2] ARTOLA J. A solution to the braced excavation collapse in Singapore[D]. Boston: Massachusetts Institute of Technology, 2005.
    [3] 李广信, 李学梅. 软黏土地基中基坑稳定分析中的强度指标[J]. 工程勘察, 2010(1): 1-4. (LI Guang-xin, LI Xue-mei. The shear strength in stability analysis of subway pit in soft clay[J]. Geotechnical Investigation & Surveying, 2010(1): 1-4. (in Chinese))
    [4] 张旷成, 李继民. 杭州地铁湘湖站“08.11.15”基坑坍塌事故分析[J]. 岩土工程学报, 2010, 32(增刊1): 338-342. (ZHANG Kuang-cheng, LI Ji-min. Accident analysis for ‘08.11.15’ foundation pit collapse of Xianghu Station of Hangzhou metro[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1): 338-342. (in Chinese))
    [5] HAACK A. Construction of the north-south-metro line in Cologne and the accident on March 3rd, 2009[C]//大会International Symposium on Social Management Systems (SSMS). 2009, 10.
    [6] ZHENG G, CHENG X S, DIAO Y, et al. Concept and design methodology of redundancy in braced excavation and case histories[J]. Geotechnical Engineering Journal of the SEAGS & AGSSEA, 2011, 42(3): 13-21.
    [7] 郑 刚, 程雪松, 刁 钰. 基坑垮塌的离散元模拟及冗余度分析[J]. 岩土力学, 2014, 35(2): 573-583. (ZHENG Gang, CHENG Xue-song, DIAO Yu. DEM simulation and redundancy analysis of excavation collapse[J]. Rock and Soil Mechanics, 2014, 35(2): 573-583. (in Chinese))
    [8] 郑 刚, 程雪松, 张 雁. 基坑环梁支撑结构的连续破坏模拟及冗余度研究[J]. 岩土工程学报, 2014, 36(1): 105-117. (ZHENG Gang, CHENG Xue-song, ZHANG Yan. Progressive collapse simulation and redundancy study of ring-beam supporting structures of excavations[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(1): 105-117. (in Chinese))
    [9] 郑 刚, 焦 莹. 深基坑工程: 设计理论及工程应用[M]. 北京: 中国建筑工业出版社, 2010. (ZHENG Gang, JIAO Ying. Deep excavation engineering: design theory and engineering applications[M]. Beijing: China Architecture and Building Press, 2010. (in Chinese))
    [10] STAROSSEK U. Typology of progressive collapse[J]. Engineering Structure, 2007, 29: 2302-2307.
    [11] MARJANISHVILI S M. Progressive analysis procedure for progressive collapse[J]. Journal of Performance of Constructed Facilities, 2004, 18(2): 79-85.
    [12] MENCHEL K, MASSART T J, RAMMER Y, et al. Comparison and study of different progressive collapse simulation techniques for RC structures[J]. Journal of Structural Engineering, 2009, 135(6): 685-697.
    [13] VLASSIS A G, IZZUDDIN B A, ELGHAZOULI A Y, et al. Progressive collapse of multi-storey buildings due to failed floor impact[J]. Engineering Structures, 2009, 31(7): 1522-1534.
    [14] MASOERO E, WITTEL F K, HERRMANN H J, et al. Progressive collapse mechanisms of brittle and ductile framed structures[J]. Journal of Engineering Mechanics, 2010, 136(8): 987-995.
    [15] Structural use of concrete: Part 1: Code of practice for design and construction[S]. British Standard Institute, 1997.
    [16] European Committee for Standardization. EN19912127: 2006, EurocodeI: Actions on structures. Part 127: General actions accidental actions[S]. Brussels, 2006.
    [17] Progressive collapse analysis and design guidelines for new federal office buildings and major modernization projects[S]. US General Service Administration, 2003.
    [18] 肖晓春, 袁金荣, 朱雁飞. 新加坡地铁环线C824标段失事原因分析(一)——工程总体情况及事故发生过程[J]. 现代隧道技术, 2009, 46(5): 66-72. (XIAO Xiao-chun, YUAN Jin-rong, ZHU Yan-fei. Causation analysis of the collapse on Singapore MRT Circle Line Lot C824 (Part I)-Project background and process of collapse[J]. Modern Tunneling Technology, 2009, 46(5): 66-72. (in Chinese))
    [19] 寇晓东, 周维垣, 杨若琼. FLAC-3D 进行三峡船闸高边坡稳定分析[J]. 岩石力学与工程学报, 2001, 20(1): 6-10. (KOU Xiao-dong, ZHOU Wei-yuan, YANG Ruo-qiong. Stability analysison the high slopes of three-gorges shiplock using FLAC-3D[J]. Chinese Journal of Rock Mechanics and Engineering, 2001, 20(1): 6-10. (in Chinese))
    [20] LADD C. Stress-strain modulus of clay in undrained shear[J]. Journal of the Soil Mechanics and Foundations Division, 1964(SM5): 103-131.
    [21] LADD C C. Stability evaluation during staged construction[J]. Journal of Geotechnical Engineering, 1991, 117(4): 540-615.
    [22] BYRNE P M, CHEUNGA H, YAN L. Soil parameters for deformation analysisof sand masses[J]. Canadian Geotechnical Journal, 1987, 24(3): 366-376.
    [23] DUNCAN J M, BYRNE P, WONG K S, et al. The strength, stress-strain and bulk modulus parameters for finite element analysis of stresses and movements in soil masses[R]. Berkeley: University of California, Berkeley, 1980.
    [24] POULOS H G. Analysis of residual stress effects in piles[J]. Journal of Geotechnical Engineering, 1987, 113(3): 216-229.
    [25] 陈国兴, 谢君斐, 张克绪. 土的动模量和阻尼比的经验估计[J]. 地震工程与工程振动, 1995, 15(1): 73-84. (CHEN Guo-xing, XIE Jun-fei, ZHANG Ke-xu. The empirical evaluation of soil moduli and damping ratio for dynamic analysis[J]. Earthquake Engineering and Engineering Vibration, 1995, 15(1): 73-84. (in Chinese))
    [26] Itasca Consulting Group, Inc. PFC 3D (particle flow codein three dimensions) version 4.0 manual[M]. Minneapolis: Itasca Consulting Group Inc, 2008.
    [27] JGJ120—2012 建筑基坑支护技术规程[S]. 2012. (JGJ120—2012 Technical specification for retaining and protection of building foundation excavations[S]. 2012. (in Chinese))
    [28] GB 50010—2010 混凝土结构设计规范[S]. 2010. (GB 50010—2010 Code for design of concrete structures[S]. 2010. (in Chinese))
  • 期刊类型引用(4)

    1. 鲁喜辉,刘计寒,李文杰,吴佳佳,杨帆,白刚,方程,宋凯,韩昌良. 深井强采动巷道顶板离层临界预警值研究及控制对策. 能源技术与管理. 2024(05): 6-9+210 . 百度学术
    2. 张丁丁. 人工解放层在冲击地压防治中的应用实践探索. 山东煤炭科技. 2023(02): 157-159+166 . 百度学术
    3. 郑建伟,王书文,李海涛,杨国强,吕大钊,刘彪,付玉凯,李晓鹏,雷国荣. 层面数量对煤岩组合体抗压特性影响的实验研究. 煤田地质与勘探. 2023(05): 11-22 . 百度学术
    4. 李忠华,包思远,梁影,尹万蕾. 矩形巷道冲击地压影响因素研究. 煤炭科学技术. 2018(10): 51-57 . 百度学术

    其他类型引用(6)

计量
  • 文章访问数:  398
  • HTML全文浏览量:  5
  • PDF下载量:  386
  • 被引次数: 10
出版历程
  • 收稿日期:  2014-06-11
  • 发布日期:  2015-07-19

目录

    /

    返回文章
    返回