• Indexed in Scopus
  • Source Journal for Chinese Scientific and Technical Papers and Citations
  • Included in A Guide to the Core Journal of China
  • Indexed in Ei Compendex
Wang Baoyu, Cha Zhenheng, Qu Guangxing, Zhang Canfeng. Construction of the Impervious Wall by the Directional Jet Grouting Method[J]. Chinese Journal of Geotechnical Engineering, 1984, 6(6): 72-83.
Citation: Wang Baoyu, Cha Zhenheng, Qu Guangxing, Zhang Canfeng. Construction of the Impervious Wall by the Directional Jet Grouting Method[J]. Chinese Journal of Geotechnical Engineering, 1984, 6(6): 72-83.

Construction of the Impervious Wall by the Directional Jet Grouting Method

More Information
  • Published Date: November 22, 1984
  • According to the technical requirement of the grout curtain to prevent the leakage in the foundation of dam, the special apparatus of the jet grouting method has been studied and equipped. In this paper, the technology to construct impervious wall by the jet grouting method is presented.This wall is in contact with the bedrock securely and its thickness is evenly and densely. The working speed is faster and construct cost is less.The set of the technique can be used to construct impervious curtain in the sand and gravelly soil foundation of lowhead dam and cut off wall. The technical parameters which have been obtained can be used to design and construction under suitable conditions.

Catalog

    Article views PDF downloads Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return