Citation: | LIN Zhi-bin, LI Yuan-hai, GUI Chang-lin, LIU Ji-qiang, QIN Xian-lin. Method for steady flow of partially penetrating well in phreatic aquifer under constant flow[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(12): 2290-2297. |
[1] |
龚晓南, 高有潮. 深基坑工程设计施工手册[M]. 北京: 中国建筑工业出版社, 2005: 28-50. (GONG Xiao-nan, GAO You-chao. The manual for design and construction of deep foundation pit[M]. Beijing: China Architecture Building Press, 1998: 28-50. (in Chinese))
|
[2] |
姚天强, 石振华. 基坑降水手册[M]. 北京: 中国建筑工业出版社, 2005: 29-30. (YAO Tian-qiang, SHI Zhen-hua. The manual of foundation pit dewatering[M]. Beijing: China Architecture Building Press, 2005: 29-30. (in Chinese))
|
[3] |
张建中, 安建龙. 不同边界条件下非完整井抽水试验渗透系数计算方法研究[J]. 工程勘察, 2012(4): 47-50. (ZHANG Jian-zhong, AN Jian-long. Study on the permeability coefficient calculation of pumping test of partial penetrating well under different boundary conditions[J]. Geotechnical Investigation Surveying, 2012(4): 47-50. (in Chinese))
|
[4] |
CHANG Y C, YEH H D. New solutions to the constant-head test performed at a partially penetrating well[J]. Journal of Hydrology, 2009, 369(1/2): 90-97.
|
[5] |
MALAMA B, KUHLMAN K L, BARRASH W. Semi- analytical solution for flow in a leaky unconfined aquifer toward a partially penetrating pumping well[J]. Journal of Hydrology, 2008, 356: 234-244.
|
[6] |
王玉林, 谢康和, 李传勋, 等. 抽-灌同轴非完整井承压层非稳定流模型及解析解[J]. 水利学报, 2012, 43(1): 60-68. (WANG Yu-lin, XIE Kang-he, LI Chuan-xun, et al. A mathematical model and its analytical solution for confined aquifer subjected to pumping and recharge implemented by a single partially penetrating well[J]. Journal of Hydraulic Engineering, 2012, 43(1): 60-68. (in Chinese))
|
[7] |
黄大中, 谢康和, 应宏伟, 等. 定流量下承压层环向非完整井流理论及应用[J]. 浙江大学学报(工学版), 2012, 46(8): 1437-1443. (HUANG Da-zhong, XIE Kang-he, YING Hong-wei, et al. Theory and application of circularly partial penetrating well flow in a confined aquifer under constant pumping rate[J]. Journal of Zhejiang University(Engineering Science), 2012, 46(8): 1437-1443. (in Chinese))
|
[8] |
刘俊龙. 潜水含水层中的非完整井降水设计计算探讨[J]. 岩土工程技术, 2002(5): 297-301. (LIU Jun-long. Research on the simplified method of design for dewatering by annular partially penetrated wells in phreatic aquifer[J]. Geotechnical Engineering Technique, 2002(5): 297-301. (in Chinese))
|
[9] |
刘国彬, 王卫东. 基坑工程手册[M]. 北京: 中国建筑工业出版社, 2009: 260-272. (LIU Guo-bin, WANG Wei-dong. Manual of foundation pit[M]. Beijing: China Architecture Building Press, 2009: 260-272. (in Chinese))
|
[10] |
陈其平. 非完整井干扰井流量计算公式[J]. 中国煤田地质, 1989, 1(4): 48-50. (CHEN Qi-ping. Computation of groundwater unstable flow and evaluation of groundwater resources[J]. Coal Geology of China, 1989, 1(4): 48-50. (in Chinese))
|
[11] |
刘庆方, 刘继强, 谭佩莲, 等. 考虑围护结构隔水作用的基坑流量计算[J]. 隧道建设, 2013, 33(2): 142-146. (LIU Qing-fang, LIU Ji-qiang, TAN Pei-lian, et al. Calculation of water inflow of foundation pits considering water insulation effect of retaining structures[J]. Tunnel Construction, 2013, 33(2): 142-146. (in Chinese))
|
[12] |
卢德生, 茹以群, 缪俊发. 非完全隔水基坑的降水计算[J]. 工程勘察, 1998, 6: 25-38. (LU De-sheng, RU Yi-qun, MIU Jun-fa. Dewatering calculation in foundation pit which is not completely watertight[J]. Geotechnical Investigation Surveying, 1998, 6: 25-38. (in Chinese))
|