Citation: | JIANG Guan-lu, WANG Li-wei, HANG Hong-xing. Modified method for additional stress of bridge-approach foundation under subgrade load[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(2): 208-218. |
[1] |
蒋关鲁,王力伟,杭红星. 基于离心模型试验的路桥变形耦合特性数值模拟研究[J]. 土木工程学报, 2012(8):148-157. (JIANG Guan-lu, WANG Li-wei, HANG Hong-xing.
Numerical simulation of centrifuge model test on coupling characteristics of bridge approach[J]. China Civil Engineering Journal, 2012(8): 148-157. (in Chinese)) |
[2] |
ELLIS E A. Centrifuge modelling of full height bridge abutments on soft clay[R]. Tests EAE3 & 4 A N Schofield & Associates' data Reports, 1993.
|
[3] |
STEWART D P. Lateral loading of piled bridge abutments due to embankment construction[D]. Nedlands: University of Western Australia, 1992.
|
[4] |
TOMIO Ito, TAMOTSU Matsui. Methods to estimate lateral force acting on stabilizing piles[J]. Soils and Foundations, 1975,15(4):43-59.
|
[5] |
律文田,冷伍明,王永和. 软土地区桥台桩基负摩阻力试验研究[J]. 岩土工程学报, 2005,27(6):642-645. (LÜ Wen-tian, LENG Wu-ming, WANG Yong-he.
In-situ tests on negative friction resistance of abutment piles in soft soil[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(6): 642-645. (in Chinese)) |
[6] |
谢洪涛,杨春和. 软基侧向变形对邻近桥台及桩基的影响和防治[J]. 岩土力学, 2002,23(6):742-746. (XIE Hong-tao, YANG Chun-he.
Discussion on the influence of lateral deformation of soft foundation on nearby bridge-pier and piled foundation and its countermeasures[J]. Rock and Soil Mechanics, 2002, 23(6): 742-746. (in Chinese)) |
[7] |
刘海滨,旷开萃. 基于布辛奈斯克解的桥头地基附加应力的计算与分析[J]. 中国市政工程, 2002(2):37-39. (LIU Hai-bin, KUANG Kai-cui.
Calculation and analysis of additional stress on abutment embankment using boussinesq's equation [J]. China Municipal Engineering, 2002(2): 37-39. (in Chinese)) |
[8] |
GERARD Parke, NIGEL Hewson. ICE manual of bridge engineering[M]. London: T-homas Telford Ltd, 2008.
|
[9] |
TB10002. 52005铁路桥涵地基和基础设计规范[S]. 北京:中国铁道出版社, 2005.(TB10002.52005Code for design on subsoil and foundation of railway bridge and culvert[S]. Beijing
|
[10] |
JTG D632007公路桥涵地基与基础设计规范[S]. 北京:人民交通出版社, 2011. (JTG D632007 Code for Design of Ground Base and Foundation of Highway Bridges and Culverts[S]. Beijing: China Communications Press, 2011.(in Chinese))
|
[11] |
杨 奇,冷伍明,邓宗伟,等. 桥台地基附加竖向压应力通用计算公式[J]. 岩土力学, 2008(3):833-837. (YANG Qi, LENG Wu-ming, DENG Zong-wei, et al. Universal calculation formula of additional vertical stress under bridge abutment due to embankment and conical slope[J]. Rock and Soil Mechanics, 2008(3)
|
[12] |
蒋关鲁,王海龙,李安洪. 高速铁路路基基底应力计算方法研究[J]. 铁道建筑, 2009(4):65-69. (JIANG Guan-lu, WANG Hai-long, LI An-hong.
Study on the base stresses calculation methods of high-speed railway subgrade[J]. Railway Engineering, 2009(4): 65-69. (in Chinese)) |
[13] |
蒋关鲁,王海龙,李安洪,等. 土质路基荷载下地基反力试验研究[J]. 铁道学报, 2012(6):69-74. (JIANG Guan-lu, WANG Hai-long, LI An-hong, et al. Experimental study on ground reaction under subgrade[J]. Journal of the China Railway Society, 2012(6)
|
[14] |
铁道第三勘察设计院. 铁路工程设计技术手册桥涵地基和基础[M]. 北京: 中国铁道出版社, 2002.(The Third Railway Survey and Design Institute Group Corporation. Technical manual for design of railway engineering-subsoil and foundation of bridge and culvert[M]. Beijing
|
[15] |
黄晓明,等. 高速公路路桥(涵)过渡段回填分析方法及应用技术[M]. 北京: 人民交通出版社, 2007.(HUANG Xiao-ming, et al. Cover method and application technology of high-way bridge (culvert)transition[M]. Beijing:ChinaCommunications Press, 2007. (in Chinese))
|
[16] |
中铁二院工程集团有限责任公司. 客运专线中等压缩性土地基沉降特性及处理技术研究总报告[R]. 成都, 2010.(China Railway Eryuan Engineering Group Co. Ltd. Settlement characteristics and processing technology of passenger medium compression soil general report[R]. Chengdu, 2010. (in Chinese))
|