Citation: | SUN Liang. Design and analysis of retaining structure for deep excavation of Banghua Global Plaza in Guangzhou[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 756-760. |
[1] |
DBJ 15—31—2003建筑地基基础设计规范[S]. 2003. (DBJ 15—31—2003 Design code for building foundation[S]. 2003. (in Chinese))
|
[2] |
GJB 02—98广州地区建筑基坑支护技术规定[S]. (GJB 02—98 Technical specification for retaining and protection of building foundation Exacavation in Guangzhou area[S]. (in Chinese))
|
[3] |
林 鹏, 王艳峰, 范志雄, 等. 双排桩支护结构在软土基坑工程中的应用分析[J]. 岩土工程学报, 2010, 32(增刊2): 331–334. (LIN Peng, WANG Yan-feng, FAN Zhi-xiong, et al. Application and analysis of retaining structure with double-row piles in soft ground excavation engineering[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S2): 331–334. (in Chinese))
|
[4] |
郑 刚, 李 欣, 刘 畅, 等. 考虑桩土相互作用的双排桩分析[J]. 建筑结构学报, 2004(2): 99–106: (ZHENG Gang, LI Xin, LIU Chang, et al. Analysis of double-row piles in consideration of the pile-soil interaction[J]. Journal of Building Structures, 2004(2): 99–106. (in Chinese))
|
[5] |
吴 刚, 白 冰, 聂庆科. 深基坑双排桩支护结构设计计算方法研究[J]. 岩土力学, 2008(10): 2753–2757. (WU Gang, BAI Bing, NIE Qing-ke. Research on calculation method of double-row piles retaining structure for deep excavation[J]. Rock and Soil Mechanics, 2008(10): 2753–2757. (in Chinese))
|
[1] | SHENG Zhi-qiang, TENG Yan-jing, LI Ping. Discussion on several problems in design of retaining structures of deep excavation[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(1): 94-101. DOI: 10.11779/CJGE202101011 |
[2] | ZHOU Yong, ZHANG Lei. Sensitivity analysis of design parameters of soil-nailing and prestressed anchor structure for deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 106-112. DOI: 10.11779/CJGE2014S2018 |
[3] | HUANG Cheng-zhong. Design and analysis of supports for deep foundation pit under an existing high-steep retaining wall[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 92-98. DOI: 10.11779/CJGE2014S2016 |
[4] | REN Wang-dong, ZHANG Tong-xing, ZHANG Da-ming, LI Yuan-lin, ZHANG Ning, SUN Yan-sheng, ZHENG Gang. Parametric analysis of failure modes and stability of muti-level retaining structure in deep excavations[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 919-922. |
[5] | TANG Jun. Design and analysis of retaining structures for a super-deep excavationin Shanghai using late-dismantling support[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 451-455. |
[6] | BAI Cheng-sheng. Numerical analysis of deformation of excavation of Foshan Dongping Plaza using edge top-down construction method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 139-144. |
[7] | AN Guanfeng, GAO Junyue. Comprehensive analysis of deep foundation pits for underground space in Guangzhou[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(6): 872-879. |
[8] | AN Guanfeng, SONG Erxiang. The analysis of excavation monitoring for the Pazhouta subway station in Guangzhou[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(3): 333-337. |
[9] | Gu Weiping, Li Guoxiong. Analysis and design of foundation underpinning for No.1 subway Guangzhou[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(1): 98-103. |
[10] | Zhang Qinxi, Sun Jiale, Liu Ke. Principle and application of deformation control design for retaining structure in deep excavation[J]. Chinese Journal of Geotechnical Engineering, 1999, 21(2): 26-30. |