Citation: | FENG Chen, FENG Shen-hui. Prevention and treatment of shallow pit accidents in deep and soft soil areas[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 711-714. |
[1] |
DBJ/T 15—20—97建筑基坑支护工程技术规程[S]. 1997. (DBJ/T 15—20—97 Specification for retaining and protection in building excavation engineering[S]. 1997. (in Chinese))
|
[2] |
张继芳. 澳门大学排洪渠设计[R]. 珠海: 湖北水利水电勘测设计院, 2011. (ZHANG Ji-fang. Flood channel design of Macao University[R]. Zhuhai: Hubei Water Resources and Hydropower Planning Survey and Design Institute, 2011. (in Chinese))
|
[3] |
GB 50497—2009 建筑基坑工程监测技术规范[S]. 2002. (GB 50497—2009 Technical code for monitoring of building excavation engineering[S]. 2002. (in Chinese))
|
[4] |
JGJ 79—2002 建筑地基处理技术规范[S]. 2002. (JGJ 79—2002 Technical code for ground treatment of buildings[S]. 2002. (in Chinese))
|
[1] | YIN Li-jie, LI Yu-jie, ZHU Yan-peng, HUO Bin, YANG Zhi-tuan, DUAN Qin-chuan. Monitoring and numerical simulation of support for foundation pit at Yanyuan Road Station of Lanzhou Metro[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(S1): 111-116. DOI: 10.11779/CJGE2021S1020 |
[2] | LI Fang-ming, CHEN Guo-xing, LIU Xue-zhu. Deformation characteristics of suspended curtain deep foundation pit of metro lines[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(12): 2182-2190. DOI: 10.11779/CJGE201812004 |
[3] | HU Bin, WANG Xin-gang, FENG Xiao-la, HU Qi-chen, WANG Wei. Analytical prediction and numerical simulation of effect of a deep excavation project of wuhan metro on nearby viaduct[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 368-373. DOI: 10.11779/CJGE2014S2064 |
[4] | LI Bing-he, LIU Xing-wang, CAO Guo-qiang. Design and construction of foundation pit of MTR property project under complex conditions[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 12-16. DOI: 10.11779/CJGE2014S1002 |
[5] | DING Zhi, GE Guo-bao, WEI Xin-jiang, JIANG Ji-qing. Variation of stress state of foundation soils induced by running subway[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 647-651. |
[6] | WANG Zhi-hong. Design of deep excavation of Pingleyuan Station of Beijing Metro using covering top-down method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 699-704. |
[7] | TANG Chuan-zheng, PENG Xiao-qiu, XIONG Qiu-mei, WANG Yue. Control and analysis of construction risk in excavations of stations of project stage No. 1 of Metro Line 3 in Wuhan[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 415-418. |
[8] | TU Chuan-bao, CHEN Yong, LIU Guo-bin, LI Xiang-yu. Research and practice of monitoring indices for deep excavations of metro[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 28-32. |
[9] | HUANG Hongwei, ZHU Lin, XIE Xiongyao. Risk assessment on engineering feasibility of key events in Shanghai metro line No. 11[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(7): 1103-1107. |
[10] | CHENG Hua, ZANG Hua. Quasi-coupling numeric analysis of frost heave effect of horizontal freezing in artificial ground[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(1): 87-90. |