Citation: | WANG Zhi-hong. Design of deep excavation of Pingleyuan Station of Beijing Metro using covering top-down method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 699-704. |
[1] |
北京地铁十四号线平乐园站施工设计[R]. (Construction design of Pingleyuan station of Beijing metro line No.14[R]. (in Chinese))
|
[2] |
GB 50157—2003 地铁设计规范[S]. (GB 50157—2003 Code for design of metro[S]. (in Chinese))
|
[3] |
刘国彬, 王卫东. 基坑工程手册[M]. 2版. 北京: 中国建筑工业出版社, 2009. (LIU Guo-bin, WANG Wei-dong. Excavation engineering manual[M]. 2nd ed. Beijing: China Architecture & Building Press, 2009. (in Chinese))
|
[4] |
刘 钊, 佘才高, 周振强. 地铁工程设计与施工[M]. 北京: 人民交通出版社, 2004. (LIU Zhao, SHE Cai-gao, ZHOU Zheng-qiang. Design and construction of metro engineering[M]. Beijing China Communications Press, 2004. (in Chinese))
|