Citation: | TANG Chuan-zheng, PENG Xiao-qiu, XIONG Qiu-mei, WANG Yue. Control and analysis of construction risk in excavations of stations of project stage No. 1 of Metro Line 3 in Wuhan[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 415-418. |
[1] |
中铁第四勘察设计院集团有限公司.武汉市轨道交通3号线一期工程初步设计阶段工程安全质量风险评估报告[R]. 2012. (China Railway Siyuan Survey And Design Group Co., LTD. Project preliminary design stage engineering risk assessment of safety and quality reports in Wuhan Rail Transit line No.3[R]. 2012. (in Chinese))
|
[2] |
唐传政, 彭晓秋. 武汉轨道交通二号线一期车站基坑支护方案探讨[J]. 岩土工程学报, 2008, 30(增刊). (TANG Chuan-zheng, PENG Xiao-qiu. Investigate on excavation supporting scheme of the first-stage project of station in Wuhan Rail Transit[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(S0). (in Chinese))
|
[3] |
唐传政, 彭晓秋. 武汉地铁基坑工程地下水问题及其处理对策[J]. 岩土工程学报, 2010, 32(增刊1). (TANG Chuan-zheng, PENG Xiao-qiu. Wuhan metro excavation and treatment of the groundwater[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S1). (in Chinese))
|
[4] |
唐传政, 熊秋梅. 浅议武汉地区地下空间建设中的施工技术问题[C]// 中国城市地下空间开发高峰论坛论文集. 武汉: 武汉理工大学出版社, 2011. (TANG Chuan-zheng, XIONG Qiu-mei. Discussion on construction of technical problems in construction of underground space in Wuhan region[C]// Proceedings of the Summit Forum on Urban Underground Space Development in China. Wuhan: Wuhan University of Technology Press, 2011. (in Chinese))
|