Citation: | GUO Xiao-hang, XIE Xiao-lin, JIA Jian. Differential displacement control of deep foundation pits in soft clay by use of top-down excavation method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 72-76. |
[1] |
贾 坚. 逆作开挖深基坑控制卸载变形的方法与实践[J]. 岩土工程学报, 2007, 29(2): 304–308. (JIA Jian. Deflection controlling measures and practices of deep foundation pits by use of top-down excavation method[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(2): 304–308. (in Chinese))
|
[2] |
刘国彬, 王卫东. 基坑工程手册[M]. 北京: 中国建筑工业出版社, 2009: 185. (LIU Guo-bin, WANG Wei-dong. Excavation engineering handbook[M]. Beijing: China Architecture & Building Press, 2009: 185. (in Chinese))
|
[3] |
邓指军, 贾 坚. 地铁车站深基坑卸荷回弹影响深度的试验[J]. 城市轨道交通研究, 2008, 11(3): 52–55. (DENG Zhi-jun, JIA Jian. On unloading resilience depth in deep station foundation pit[J]. Urban Mass Transit, 2008, 11(3): 52–55. (in Chinese))
|
[4] |
王允恭. 逆作法设计施工与实例[M]. 北京: 中国建筑工业出版社, 2011: 35. (WANG Yun-gong, Design and construction of top-down excavation and project practice[M]. Beijing: China Architecture & Building Press, 2011: 35. (in Chinese))
|
[5] |
刘建航, 侯学渊. 基坑工程手册[M]. 北京: 中国建筑工业出版社, 1997: 35–36. (LIU Jian-hang, HOU Xue-yuan. Excavation engineering handbook[M]. Beijing: China Architecture & Building Press, 1997: 35–36. (in Chinese))
|
[6] |
DG/TJ08—61—2010 上海市工程建设规范–基坑工程技术规范[S]. (DG/TJ08—61—2010 Technical code for excavation engineering[S]. 2010. (in Chinese))
|