Citation: | WANG Wei, YANG Min. General analysis method of piled raft foundation under vertical loading[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(1): 106-111. |
[1] | FENG Xing, YAO Yang-ping, Li Ru-ning, WAN Zheng. Application of UH model considering temperature to finite element method[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(zk2): 181-185. DOI: 10.11779/CJGE2015S2035 |
[2] | DU Chuang, DING Hong-yan, ZHANG Pu-yang, LI Jing. Analysis of steel sheet pile cofferdam using finite element method[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 159-164. DOI: 10.11779/CJGE2014S2027 |
[3] | GUO Yong-cheng, LI Jian-lin, WANG Xing-xia. Finite element analysis of entrance slope of expansion project of Huanglongtan Power Plant[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 202-206. |
[4] | Finite element method for covered sheet pile wharfs[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(4). |
[5] | LI Yiwen, ZHOU Jian. Analysis of tunnel vibration due to pile driving under soil-structure dynamic interaction[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(1): 60-65. |
[6] | Analysis of the properties of DCM by dynamic FEM[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(4): 561-564. |
[7] | LU Xinzheng, SONG Erxiang, JI Lin, SUI Feng. 3-Dimensional FEA for the interaction between supporting structure of excavation and soil in a very deep pit[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(4): 488-491. |
[8] | ZHENG Hong, LI Chunguang, Lee C.F., GE Xiurun. Finite element method for solving the factor of safety[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(5): 626-628. |
[9] | ZHENG Hong, C. F. Lee, L. G. Tham, Ge Xiurun. Displacement-controlled method in finite element analysis and its applications[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(1): 81-85. |
[10] | Zhang Xiang, Song Qigen, Zhu Wanfu. Analysis of Thick Plates on Two Parameter Elastic Foundations by FE and BE Methods[J]. Chinese Journal of Geotechnical Engineering, 1995, 17(1): 46-52. |