LIU Xinrong, SUN Hui, CHENG Xiaojiang, QU Wanbo, DONG Zhanwen. Structural analysis and monitoring for secondary lining of doubled arch tunnel in loess[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(6): 695-697.
    Citation: LIU Xinrong, SUN Hui, CHENG Xiaojiang, QU Wanbo, DONG Zhanwen. Structural analysis and monitoring for secondary lining of doubled arch tunnel in loess[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(6): 695-697.

    Structural analysis and monitoring for secondary lining of doubled arch tunnel in loess

    More Information
    • Published Date: June 15, 2005
    • As the large spanned arch tunnel is influenced by the structure and span, the loads on initial support and secondary lining are different. Based on numerical calculation and monitoring, it was shown that there were different pressures on the initial support and secondary lining. The load on secondary lining was large. The secondary lining was an important part of the supporting structure. The magnitude of the load was affected by the construction duration. It is necessary to know the distribution of load and the construction duration when we design and construct such tunnels.
    • Related Articles

      [7]Zhou Hongkui, Jiang Shuqing, Zhang Chaoying. Selection of the Standard for Liquid Limit and Plastic Limit[J]. Chinese Journal of Geotechnical Engineering, 1985, 7(4): 86-93.
      [9]Rao Hongyan. Improvement on the Combined Determination Method of Atterberg Limits of Soils[J]. Chinese Journal of Geotechnical Engineering, 1983, 5(1): 51-64.
      [10]Guo Chengqian. Compaction of Clayey Soil in Earth-rock Dam[J]. Chinese Journal of Geotechnical Engineering, 1982, 4(4): 68-77.

    Catalog

      DONG Zhanwen

      1. On this Site
      2. On Google Scholar
      3. On PubMed
      Article views (1101) PDF downloads (347) Cited by()
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return