Citation: | LIANG Bo, WANG Jiadong, GE Jianjun, CAO Yuanping. Testing and analysis of earth pressure about L type retaining wall in Qinghai-Tibet railway[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(5): 627-631. |
[1] | WANG Lizhong, LAI Yongqing, HONG Yi, ZHANG Youhu. A unified "p-y+M-θ " model for laterally loaded piles considering rigidities of various piles[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(5): 905-918. DOI: 10.11779/CJGE20230042 |
[2] | MU Lin-long, KANG Xing-yu, LI Wan. Analytical method for single pile under V-H-M combined loads in sand[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 153-156. DOI: 10.11779/CJGE2017S2038 |
[3] | LIU Chuan-ping. Design and study of composite pile foundation of asymmetric twin towers of high-rise buildings under complicated geological conditions[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 1113-1116. |
[4] | LI Yun, GU Kai-yun, LIN Jing. Design method for bracing of asymmetric cylindrical foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 888-891. |
[5] | LIU Shan-nan, HOU Sheng-nan, CAI Zhong-xiang. Applicability of m-method for horizontal bearing capacity of single pile in Shanghai area[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 721-724. |
[6] | WU Jiang-bin, WANG Wei-dong, CHEN Kai. Design of socketed piles for 438 m-high Wuhan Center Building[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 76-81. |
[7] | HAN Gang, ZHAO Qi-hua, PENG She-qin. Geomechanical model for asymmetric distribution of deep-seated crack[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(11): 2123-2130. |
[8] | Measured settelements of super-long piles and pile groups for a building of 323 m in height in Wenzhou[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(3). |
[9] | WU Feng, SHI Beiling, ZHUO Yang. Nonlinear m method for piles under lateral load[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(9): 1398-1401. |
[10] | DAI Zihang, CHEN Linjing. Two numerical solutions of laterally loaded piles installed in multi-layered soils by m method[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(5): 690-696. |