Contact analysis of separation between concrete slab and cushion layer in high concrete face rock-fill dam[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(3): 361-364.
    Citation: Contact analysis of separation between concrete slab and cushion layer in high concrete face rock-fill dam[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(3): 361-364.

    Contact analysis of separation between concrete slab and cushion layer in high concrete face rock-fill dam

    • loading

    Catalog

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return