• Indexed in Scopus
  • Source Journal for Chinese Scientific and Technical Papers and Citations
  • Included in A Guide to the Core Journal of China
  • Indexed in Ei Compendex
LUO Furong, GUO Bin. Construction technology of “tunneling and top-down method” at west Tian’anmen station in metro of Beijing[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(1): 75-78.
Citation: LUO Furong, GUO Bin. Construction technology of “tunneling and top-down method” at west Tian’anmen station in metro of Beijing[J]. Chinese Journal of Geotechnical Engineering, 2001, 23(1): 75-78.

Construction technology of “tunneling and top-down method” at west Tian’anmen station in metro of Beijing

More Information
  • Published Date: January 25, 2001
  • The construction method of “tunneling and top-down method” at west Tian′anmen station in metro of Beijing is introduced,and the measured settlement of ground surface,the measured pressure of surrounding rock and the internal force of strut are analyzed.This method,which combines“top-down method” and “shallow tunneling method”,possesses the advantages,such as economization, safety and rapid construction,ect,and it can be applied to large underground engineering in the flourishing area of city.

Catalog

    Article views (1327) PDF downloads (563) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return