Citation: | NIE Ziyun, TAN Xiaobing, ZHU Zhanguo, GUAN Yongping. A new underground excavation method based on large rigidity support system[J]. Chinese Journal of Geotechnical Engineering, 2024, 46(6): 1332-1338. DOI: 10.11779/CJGE20230236 |
[1] |
龚胜. 中洞法施工技术[J]. 岩土工程学报, 2006, 28(增刊1): 1772-1775. https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC2006S1104.htm
GONG Sheng. Middle hole construction method[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(S1): 1772-1775. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTGC2006S1104.htm
|
[2] |
惠丽萍, 崔志杰. PBA工法——一种新的大型地下空间暗挖施工方法[C]// 中国土木工程学会快速轨道交通委员会学术交流会地下铁道专业委员会学术交流会, 北京, 2001.
HUI Liping, CUI Zhijie. PBA-a new subsurface excavation construction for large underground space[C]// Academic Exchange Meeting of Fast Rail Transit Committee China Civil Engineering Society, Beijing, 2001. (in Chinese)
|
[3] |
夏才初, 阙程柯, 刘胜. 顶进箱涵全断面置换管幕工法中钢管幕内力研究及实例分析[J]. 岩土力学, 2011, 32(12): 3555-3560. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201112003.htm
XIA Caichu, QUE Chengke, LIU Sheng. Study of internal forces and case study of pipe-roof for box culvert jacking and replacement full face pipe-roof method[J]. Rock and Soil Mechanics, 2011, 32(12): 3555-3560. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201112003.htm
|
[4] |
谭忠盛, 马栋, 孙晓静, 等. 不停航机场跑道下大断面隧道施工技术[J]. 土木工程学报, 2015, 48(增刊1): 378-382. https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC2015S1067.htm
TAN Zhongsheng, MA Dong, SUN Xiaojing, et al. Construction technology of large span tunnel under the non-stop flight runway[J]. China Civil Engineering Journal, 2015, 48(S1): 378-382. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC2015S1067.htm
|
[5] |
姚大钧, 吴志宏, 张郁慧. 软弱黏土中管幕工法之设计与分析[J]. 岩石力学与工程学报, 2004, 23(增刊2): 4999-5005.
YAO Dajun, WU Zhihong, ZHANG Yuhui. Design and analysis of pipe roofing method in soft clay[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(增S2): 4999-5005. (in Chinese)
|
[6] |
余晶, 程勇, 贾瑞华. 港珠澳大桥珠海连接线拱北隧道方案论证[J]. 现代隧道技术, 2012, 49(1): 119-125, 131. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD201201023.htm
YU jing, CHENG Yong, JIA Ruihua. Option demonstration for the Gongbei tunnel at the zhuhai link of the hong kong-zhuhai-macau bridge[J]. Modern Tunnelling Technology, 2012, 49(1): 119-125, 131. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD201201023.htm
|
[7] |
黎永索, 阳军生, 张可能, 等. 弧形密排大直径管群顶管地表沉降分析[J]. 中南大学学报(自然科学版), 2013, 44(11): 4687-4693. https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGD201311046.htm
LI Yongsuo, YANG Junsheng, ZHANG Keneng, et al. Surface subsidence caused by construction of large diameter curved jacking-pipes in pipe-roof pre-construction method[J]. Journal of Central South University (Science and Technology), 2013, 44(11): 4687-4693. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-ZNGD201311046.htm
|
[8] |
关永平, 贾鹏蛟, 赵文, 等. 基于ABAQUS的STS管幕结构受力性能数值分析[J]. 建筑结构, 2016, 46(增刊2): 569-573. https://www.cnki.com.cn/Article/CJFDTOTAL-JCJG2016S2122.htm
GUAN Yongping, JIA Pengjiao, ZHAO Wen, et al. Numerical analysis of mechanical behavior of steel tube slab structure based on ABAQUS[J]. Building Structure, 2016, 46(S2): 569-573. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JCJG2016S2122.htm
|
[9] |
冯建霖. 下穿机场跑道大断面隧道施工对策及地层变形规律研究[J]. 隧道建设, 2015, 35(5): 473-477. https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201505025.htm
FENG Jianlin. Study on construction countermeasures for and ground deformation rule of construction of large cross-section tunnel crossing underneath existing airport runway[J]. Tunnel Construction, 2015, 35(5): 473-477. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-JSSD201505025.htm
|
[10] |
山村学, 高橋幸久, 近藤達也. 車両基地直下の長距離パイプルーフの施工[J]. トンネル工学報告集, 2006, 16: 499-506.
HIGERU Fujimoto, YUICHI Fujita, SHINJO Sato. Under a vehicle base, we used a pipe roof method and constructed a road tunnel[J]. Collection of Tunnel Engineering Reports, 2006, 16: 499-506. (in Japanese)
|
[11] |
罗富荣, 汪玉华, 郝志宏. 地铁车站洞桩法设计与施工关键技术[M]. 北京: 中国铁道出版社, 2015.
LUO Furong, WANG Yuhua, HAO Zhihong. Key Technology of Design And Construction of Subway Station Hole Pile Method[M]. Beijing: China Railway Publishing House, 2015. (in Chinese)
|