Citation: | WANG Hong-min, WU Meng-long. Problems for reconstruction of foundation pits[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 233-236. DOI: 10.11779/CJGE2019S1059 |
[1] |
邱鸿江. 深基坑支护的超期使用与加固[J]. 工程技术, 2010(8): 202. (QIU Hong-jiang. Extended use and reinforcement of deep foundation pit support[J]. Engineering and Technology, 2010(8): 202. (in Chinese))
|
[2] |
张懿. 既有深基坑加固改造工程施工研究[J]. 住宅与房地产, 2017(2): 230. (ZHANG YI. Study on the construction of existing deep foundation pit reinforcement and reconstruction project[J]. Housing and Real Estate, 2017(2): 230. (in Chinese))
|
[3] |
JGJ120—99建筑基坑支护技术规程[S]. 1999. (JGJ120—99 Technical specifications for foundation pit support of buildings[S]. 1999. (in Chinese))
|
[4] |
CECS22:90土层锚杆设计与施工规范[S]. 1990.
(CECS22:90Code for design and construction of soil layer anchor[S]. 1990. (in Chinese)) |
[5] |
CECS 22:2005岩土锚杆(索)技术规程[S]. 2005.
(CECS22:2005 Technical specification for rock and soil bolt (cable)[S]. 2005. (in Chinese)) |
[1] | GU Xiaowei, YI Zihao, WANG Zhe, CHANG Kuan. Influences of excavation of deep foundation pits on deformation of adjacent double-line subway tunnels through measurement analysis[J]. Chinese Journal of Geotechnical Engineering, 2023, 45(S2): 214-219. DOI: 10.11779/CJGE2023S20030 |
[2] | GAO Bo, WANG Shuai-shuai, SHEN Yu-sheng, FAN Kai-xiang. Dynamic stress concentration and damping mechanism of twin cylindrical composite-lined tunnels subjected to vertical incident plane SV waves[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(2): 321-328. DOI: 10.11779/CJGE201802013 |
[3] | TUO Yong-fei, SHU Heng, GUO Xiao-hong, ZHANG Ya-guo, DING Wen-qi. Fireproof characteristics of lining and waterproof of shield tunnel with super-large diameter[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk1): 269-274. |
[4] | LIU Li-peng, WANG Xiao-gang, JIA Zhi-xin, DUAN Qing-wei, WANG Yu-jie. Method to determine reduction factor of water pressure acting on tunnel linings using water-rock independent calculation methodology[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(3): 495-500. |
[5] | LI Yong-suo, ZHANG Ke-neng, HUANG Chang-bo. Monitoring of lining structure of tunnels built by using pipe-roof pre-construction method[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(8): 1541-1547. |
[6] | LAI Hong-peng, XIE Yong-li, LIU Miao, X? Hai-biao. Mechanical characteristics for linings of shallow excavation metro tunnel in loess region[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(8): 1167-1172. |
[7] | DING Hao, JIANG Shuping, YANG Linde. Stochastic finite element analysis of surrounding rock and lining of tunnels under external water pressure[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(4): 643-647. |
[8] | ZHAO Zhanchang, XIE Yongli. Performance analysis of loess highway tunnel affected by lining parameters[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(11): 56-60. |
[9] | YUAN Jinrong, ZHOU Yuqian, LIU Xuezeng, YU Ning. Structural design of lining and parameter analysis for DOT shield tunnel[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(6): 638-641. |
[10] | Lu Jia-you. Calculation Method of Stresses in Pressure Tunnel Lining Allowing for the Characteristics of Rock Mass Deformations[J]. Chinese Journal of Geotechnical Engineering, 1982, 4(1): 84-93. |