• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
ZHANG Wen-jun, ZHANG Qi, ZHANG Gao-le. Selection of bolted joints and bending stiffness of shield tunnel of Z2 metro line in Tianjin Binhai New Area[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 113-116. DOI: 10.11779/CJGE2019S1029
Citation: ZHANG Wen-jun, ZHANG Qi, ZHANG Gao-le. Selection of bolted joints and bending stiffness of shield tunnel of Z2 metro line in Tianjin Binhai New Area[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 113-116. DOI: 10.11779/CJGE2019S1029

Selection of bolted joints and bending stiffness of shield tunnel of Z2 metro line in Tianjin Binhai New Area

More Information
  • Received Date: April 28, 2019
  • Published Date: July 14, 2019
  • Aiming at different types of bolted joints, taking into account the discontinuity of complex joints and the pre-tightening force of joints, the longitudinal joints of shield tunnel segments of Z2 metro line in Tianjin Binhai New Area are studied. The effects of straight bolts, oblique bolts and bending bolts on the mechanical properties of segment joints under different bending moments and axial forces are analyzed and compared. According to the analysis results, the applicability of the proposed three kinds of bolted joints and their values of bending stiffness under different buried depths and bending moments are given. The results show that the bolt form has little effect on the maximum stress position of the bolts. The tensile stress and joint opening of the bolts decrease with the increase of axial forces, but the bending stiffness of the joints increase. The tensile stress, dislocation and opening of the joints increase with the increase of the bending moment, but the bending stiffness of the joints decreases accordingly.
  • [1]
    朱瑶宏, 柳献, 张晨光, 等.地铁盾构隧道纵缝接头螺栓形式对比试验研究[J]. 铁道科学与工程学报, 2015, 12(6): 1427-1435.
    (ZHU Yao-hong, LIU Xian, ZHANG Chen-guang, et al.Contrast test research on longitudinal joint with different forms of bolts in metro shield tunnel[J]. Journal of Railway Science and Engineering, 2015, 12(6): 1427-1435. (in Chinese))
    [2]
    王慎堂. 隧道管片通缝拼装与错缝拼装的比较[D]. 上海: 同济大学, 2002.
    (WANG Shen-tang.The comparison of shield tunnel with segment seams in sequence and in stagger[D]. Shanghai: Tongji University, 2002. (in Chinese))
    [3]
    李守巨, 刘军豪, 上官子昌, 等.钢筋混凝土直螺栓管片接头抗弯极限承载力的简化计算模型[J]. 隧道建设, 2017, 37(1): 18-23.
    (LI Shou-ju, LIU Jun-hao, SHANG GUAN Zi-chang, et al. Simplified computing models for ultimate flexural capacity of reinforced concrete segment joints strengthened by straight bolts[J]. Tunnel Construction, 2017, 37(1): 18-23. (in Chinese))
    [4]
    李新星, 杨志豪, 曹文宏. 超大隧道装配式管片接头刚度的模型试验研究[J]. 土木工程学报, 2015, 48(2): 315-320.
    (LI Xin-xing, YANG Zhi-hao, CAO Wen-hong.Experimental investigations on stiffness of segment joints of larger tunnel prefabricated lining[J]. China Civil Engineering Journal, 2015, 48(2): 315-320. (in Chinese))
    [5]
    张稳军, 张云旆, 宋晓龙. 盾构隧道弯螺栓接头力学特性受预紧力影响的数值研究[J]. 岩土工程学报, 2017, 39(2): 203-206.
    (ZHANG Wen-jun, ZHANG Yun-pei, SONG Xiao-long.Numerical study on mechanical behavior of bent bolted connection in shield tunnel under effect of preload[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(2): 203-206. (in Chinese)

Catalog

    Article views (256) PDF downloads (118) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return