Citation: | LEI Hua-yang, ZHANG Lei, XU Ying-gang, LIANG Jian-wen, BA Zhen-ning. Numerical simulation of settlement of soft soil foundation under fast metro train loads[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S1): 45-48. DOI: 10.11779/CJGE2019S1012 |
[1] |
陈德智. 广州地铁隧道运营期沉降监测及分析[J]. 都市快轨交通, 2011, 24(4): 94-98.
(CHEN De-zhi.Subsidence monitoring and analysis for guangzhou subway tunnels[J]. Urban Rapid Rail Transit, 2011, 24(4): 94-98. (in Chinese)) |
[2] |
张冬梅, 李钰. 地铁荷载引起的盾构隧道及土层长期沉降研究[J]. 防灾减灾工程学报, 2015(5): 563-567.
(ZHANG Dong-mei, LI Yu.Long-term settlement of shield tunnel in soft clay due to vehicle vibration[J]. Journal of Disaster Prevention and Mitigation Engineering, 2015(5): 563-567. (in Chinese)) |
[3] |
KAYNIA A M, MADSHUS C, ZACKRISSON P.Ground vibration from high-speed trains: prediction and countermeasure[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2000, 126(6): 531-537.
|
[4] |
XIE Wei-ping, LUO Qiang, WANG Guo-bo.Elastic-plastic analysis of Foundation settlement caused by subway load[C]// The First International Symposium on Innovation & Sustainability of Modern Railway. Nanchang, 2008: 56-62.
|
[5] |
CARTER J P, BOOKER J R.Elastic consolidation around a deep circular tunnel[J]. International Journal of Solids and Structures, 1982, 18(12): 1059-1074.
|
[6] |
张学钢, 黄阿岗, 郭旺军. 列车荷载长期作用下隧道地基固结变形的数值分析[J]. 铁道工程学报, 2011(4): 22-26.
(ZHANG Xue-gang, HUANG A-gang, GUO Wang-jun.Numerical analysis of consolidation deformation of tunnel foundation under effect of long-term train load[J]. Journal of Railway Engineering Society, 2011(4): 22-26. (in Chinese)) |
[7] |
黄茂松, 姚兆明. 循环荷载下饱和软黏土的累积变形显式模型[J]. 岩土工程学报, 2011, 33(3): 325-331.
(HUANG Mao-song, YAO Zhao-ming.Explicit model for saturated clay behavior subjected to cyclic loading[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(3): 325-331. (in Chinese)) |
[8] |
CHAI J C, MIURA N, ZHU H H, et al.Compression and consolidation characteristics of structured natural clay[J]. Canadian Geotechnical Journal, 2004, 41(6): 1250-1258.
|
[9] |
杨兵明. 软土地层盾构隧道长期沉降规律及预测研究[J]. 铁道工程学报, 2015, 32(11): 87-92.
(YANG Bing-ming.Research on law and prediction of long-term settlement of shield tunnel in soft soil stratum[J]. Journal of Railway Engineering Society, 2015, 32(11): 87-92. (in Chinese)) |
[10] |
唐益群, 栾长青, 张曦, 等. 地铁振动荷载作用下隧道土体变形数值模拟[J]. 地下空间与工程学报, 2008, 4(1): 105-110.
(TANG Yi-qun, LUAN Chang-qing, ZHANG Xi, et al.Numerical simulation of saturated soft clay’s deformation around tunnel under subway vibrational loading[J]. Chinese Journal of Underground Space and Engineering, 2008, 4(1): 105-110. (in Chinese)) |
[11] |
FANG Y S, LIN J S, SU C S.An estimation of ground settlement due to shield tunneling by the Peck-Fujita method[J]. Canadian Geotechnical Journal, 1994, 31(3): 431-443.
|
[12] |
JIANG Zhou, GAO Guang-yun, ZHAO Hong, et al.Long-term settlement of tunnels induced by subway moving load in soft soil districts[J]. Journal of Geotechnical Engineering, 2013(35): 301-307.
|
[13] |
高广运, 徐大为, 张先林, 等. 地铁循环荷载作用下上海软土路基的长期沉降计算[J]. 桂林理工大学学报, 2012, 32(3): 370-374.
(GAO Guang-yun, XU Da-wei, ZHANG Xian-lin, et al.Long-term settlement calculation of Shanghai metro soft soil foundation under cyclic loading[J]. Journal of Guilin University of Technology, 2012, 32(3): 370-374. (in Chinese)) |