• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
YANG Zhi-yong, JIANG Yu-sheng, ZHANG Jin-xun. Radial opening ratio of EPB TBM cutterheads[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(12): 2312-2317. DOI: 10.11779/CJGE201812020
Citation: YANG Zhi-yong, JIANG Yu-sheng, ZHANG Jin-xun. Radial opening ratio of EPB TBM cutterheads[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(12): 2312-2317. DOI: 10.11779/CJGE201812020

Radial opening ratio of EPB TBM cutterheads

More Information
  • Received Date: December 17, 2017
  • Published Date: December 24, 2018
  • The opening ratio of cutterheads, the area ratio of the cutterhead openings to the entire cutterhead, is an important index for selection of earth pressure balanced (EPB) TBM. However, the opening ratio of cutterheads alone cannot fully reflect whether the positions of the cutterhead openings are reasonable or not. To solve this problem, the concept of radial opening ratio of cutterheads is proposed. Based on the characteristic curve of the radial opening ratio, the radial abrasion events of TBM cutterheads during construction of Military Museum Station to East Diaoyutai Station of Beijing Metro Line 9 are analyzed. The main reason of radial abrasion is that the radial opening ratio is too small in a certain area on the cutterhead, and part of the soil deposits in this area. Besides, it also causes the cutterhead to abrase when soil flows from the small opening ratio area to the large one. The characteristic curve of the radial opening ratio can be used to evaluate the rationality of opening position on the cutterhead. For the TBM cutterhead with reasonable opening positions, the characteristic curve of the radial opening ratio should be gentle without large fluctuations except for the central area of the cutterhead so as to ensure the reasonable opening positions in each part of the cutterhead and smooth soil moving into the chamber. The radial opening ratio should be fully considered when designing TBM cutterheads.
  • [1]
    BURGER W. design pinciples for soft ground cutterheads[C]// Proceedings, Rapid Excavation and Tunneling Conference. 2007: 784-792.
    [2]
    李向红, 傅德明. 土压平衡模型盾构掘进试验研究[J]. 岩土工程学报, 2006, 28(9): 1101-1105.
    (LI Xiang-hong. FU Deming.Experimental study on excavation behaviour using model epb shield with a diameter of 1.8 m[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(9): 1101-1105. (in Chinese))
    [3]
    王洪新. 土压平衡盾构刀盘开口率选型及其对地层适应性研究[J]. 土木工程学报, 2010(3): 88-92.
    (WANG Hong-xin.Type selection of the head aperture ratio of EPB shield cutterheads and adaptability to stratum characteristics[J]. China Civil Engineering Journal, 2010(3): 88-92. (in Chinese))
    [4]
    ZHAO J, GONG Q M, EISENSTEN Z.Tunnelling through a frequently changing and mixed ground: a case history in Singapore[J]. Tunnelling and Underground Space Technology, 2007, 22(4): 388-400.
    [5]
    MAID U.Design features of the botlek rail tunnel in the betuweroute[J]. Tunnelling and Underground Space Technology, 1999, 14(2): 135-140.
    [6]
    ATES U, BILGIN N, COPUR H.Estimating torque, thrust and other design parameters of different type TBMs with some criticism to TBMs used in Turkish tunneling projects[J]. Tunnelling and Underground Space Technology, 2014, 40(Supplement C): 46-63.
    [7]
    CARRIERI G, FORNARI E, GUGLIELMETTI V, et al.Torino metro line 1: use of three tbm-epbs in very coarse grained soil conditions[J]. Tunnelling and Underground Space Technology, 2006, 21(3): 274-275.
    [8]
    江华, 张晋勋, 苏艺, 等. 砂卵石地层土压平衡盾构隧道施工土体改良试验研究[J]. 中国铁道科学, 2013, 34(4): 40-45.
    (JIANG Hua, ZHANG Jin-xun, SU Yi, et al.Study on soil conditioning experiments during earth pressure balance shield tunneling in sand gravel strata[J]. China Railway Science, 2013, 34(4): 40-45. (in Chinese))
    [9]
    XU Q, ZHU H, DING W.Laboratory model tests and field investigations of epb shield machine tunnelling in soft ground in Shanghai[J]. Tunnelling and Underground Space Technology, 2011, 26(1): 1-14.
    [10]
    刘建琴, 郭伟, 黄丙庆, 等. 土压平衡盾构刀盘开口率与刀盘前后压差的关系[J]. 天津大学学报, 2011, 44(8): 659-664.
    (LIU Jian-qin, GUO Wei, HUANG Bing-qing, et al.Relationship between aperture ratio and fore-and-back pressure of EPB shield cutter head[J]. Journal of Tianjin University, 2011, 44(8): 659-664. (in Chinese))
    [11]
    王洪新. 土压平衡盾构刀盘开口率对土舱压力的影响[J]. 地下空间与工程学报, 2012, 8(1): 89-93, 104.(WANG Hong-xin. Influence of aperture ratio of cutterhead of EPB shield on earth pressure in the chamber[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(1): 89-93, 104. (in Chinese))
    [12]
    王洪新. 土压平衡盾构刀盘挤土效应及刀盘开口率对盾构正面接触压力影响[J]. 土木工程学报, 2009(7): 113-118.
    (WANG Hong-xin.Effect of cutterhead compressing the front soil and influence of head aperture ratio on contact pressure of EPB shield to the front soil[J]. China Civil Engineering Journal, 2009(7): 113-118. (in Chinese))

Catalog

    Article views PDF downloads Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return