Citation: | YANG Li-yun, DING Chen-xi, ZHENG Li-shuang, BAO Shi-jun, ZHANG Yong-jin, LIU Zhen-kun. Evolution of blasting cracks in different static compression fields[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(7): 1322-1327. DOI: 10.11779/CJGE201807020 |
[1] |
LU W, CHEN M, GENG X, et al.A study of excavation sequence and contour blasting method for underground powerhouses of hydropower stations[J]. Tunnelling and Underground Space Technology, 2012, 29: 31-39.
|
[2] |
戴俊. 深埋岩石隧洞的周边控制爆破方法与参数确定[J].爆炸与冲击, 2004, 24(6): 493-498.
(DAI Jun.The controlled contour blasting technique and its parameter determination for rock tunnel at depth[J]. Explosion and Shock Wave, 2004, 24(6) : 493-498. (in Chinese)) |
[3] |
戴俊, 钱七虎. 高地应力条件下的巷道崩落爆破参数[J]. 爆炸与冲击, 2007, 27(3): 272-276.
(DAI Jun, QIAN Qi-hu.Break blasting parameters for driving a roadway in rock with high residual stress[J]. Explosion and Shock Wave, 2007, 27(3): 272-276. (in Chinese)) |
[4] |
刘殿书, 王万富, 杨吕俊. 初始应力条件下爆破机理的动光弹实验研究[J]. 煤炭学报, 1999, 24(6): 612-614.
(LIU Dian-shu, WANG Wan-fun, YANG Lü-jun.Holophotoelasticity study on mechanism of blasting under initiative stress field[J]. Journal of China Coal Society, 1999, 24(6): 612-614. (in Chinese)) |
[5] |
肖正学, 张志呈, 李端明. 初始应力场对爆破效果的影响[J]. 煤炭学报, 1996, 21(5): 497-501.
(XIAO Zheng-xue, ZHANG Zhi-cheng, LI Rui-ming.The influence of initial stress field on blasting[J]. Journal of China Coal Society, 1996, 21(5): 497-501. (in Chinese)) |
[6] |
高全臣, 赫建明, 冯贵文, 等. 高应力岩巷的控制爆破机理与技术[J]. 爆破, 2003, 20(增刊): 52-55.
(GAO Quan-chen, HAO Jian-ming, FENG Gui-wen, et al.Mechanism and technology of controlled blasting for high stress rock tunneling[J]. Blasting, 2003, 20(S0) : 52-55. (in Chinese)) |
[7] |
KUTTER H K, FAIRHURST C.On the fracture process in blasting[J]. International Journal of Rock Mechanics and Mining Science, 1971, 8: 181-202.
|
[8] |
ROSSMANITH H P, KNASMILLNER R E, DAEHNKE A, et al.Wave propagation, damage evolution, and dynamic fracture extension part II: blasting[J]. Materials Science, 1996, 32(4): 403-410.
|
[9] |
杨立云, 马佳辉, 王学东, 等. 压应力场中爆生裂纹分布与扩展特征实验分析[J]. 爆炸与冲击, 2017, 37(2): 262-268.
(YANG Li-yun, MA Jia-hui, WANG Xue-dong, et al.Experimental study on blasting crack initiation and propagation behavior in compression stress field[J]. Explosion and Shock Wave, 2017, 37(2): 262-268. (in Chinese)) |
[10] |
白羽, 朱万成, 魏晨慧, 等. 不同地应力条件下双孔爆破的数值模拟[J]. 岩土力学, 2013, 34(增刊1): 466-471.
(BAI Yu, ZHU Wan-cheng, WEI Chen-hui, et al.Numerical simulation on two-hole blasting under different in-situ stress conditions[J]. Rock and Soil Mechanics, 2013, 34(S1): 466-471. (in Chinese)) |
[11] |
中国航空研究院. 应力强度因子手册[M]. 北京: 科学出版社, 1981.
(Chinese Aeronautical Establishment.Handbook of stress intensity factor[M]. Beijing: Science Press, 1981. (in Chinese)) |
[12] |
SMITH D J, AYATOLLAHI M R, PAVIER M J.The role of T-stress in brittle fracture for linear elastic materials under mixed-mode loading[J]. Fatigue & Fracture of Engineering Materials & Structures, 2001, 24(2): 137-150.
|
[13] |
杨立云, 杨仁树, 许鹏. 新型数字激光动态焦散线实验系统及其应用[J]. 中国矿业大学学报, 2013, 42(2): 188-194.
(YANG Li-yun, YANG Ren-shu, XU Peng.Caustics method combined with laser & digital high-speed camera and its applications[J]. Journal of China University of Mining & Technology, 2013, 42(2): 188-194. (in Chinese)) |
1. |
李晓龙,栗鹏超,刘小锋,孙立军,郭长龙,何况. 富水粉细砂层联络通道顶管法施工地表沉降分析. 郑州大学学报(工学版). 2025(01): 67-74 .
![]() | |
2. |
杜明芳,赵洁,易领兵,张鹏,王宗勇,任方毅,朱行通. 地铁盾构区间机械法联络通道施工全过程正线隧道力学响应分析. 城市轨道交通研究. 2025(03): 6-13 .
![]() | |
3. |
黄大维,陈后宏,徐长节,罗文俊,耿大新,刘家璇. 联络通道施工盾构机始发对已建盾构隧道影响试验研究. 岩土工程学报. 2025(05): 987-994 .
![]() | |
4. |
周萌. 盾构法联络通道不同开洞位置对主隧道管片内力影响. 城市轨道交通研究. 2024(07): 81-87 .
![]() | |
5. |
陈星欣,何明高,施文城,郭力群. 土岩复合地层盾构地中对接法刀盘拆卸不完全拱压力计算. 岩土工程学报. 2024(12): 2652-2660 .
![]() | |
6. |
焦月红,万治安,顾佳伟,王寿鹤,周游,王勇,张跃曦. 装配式钢板箱水土中接收监测分析. 建设科技. 2024(S1): 199-202 .
![]() |