Citation: | HE Man-chao, GUO Peng-fei, WANG Jiong, WANG Hao. Experimental study on gob-side entry formed by roof cut of broken roof at shallow depth of Hecaogou No. 2 Coalmine[J]. Chinese Journal of Geotechnical Engineering, 2018, 40(3): 391-398. DOI: 10.11779/CJGE201803001 |
[1] |
钱鸣高, 石平五, 许家林. 矿山压力与岩层控制[M]. 徐州:中国矿业大学出版社, 2010: 65-99.
(QIAN Ming-gao, SHI Ping-wu, XU Jia-lin.Ground pressure and strata control[M]. Xuzhou: China University of Mining and Technology Press, 2010: 65-99. (in Chinese)) |
[2] |
宋振骐. 实用矿山压力[M]. 徐州: 中国矿业大学出版社, 1988: 41-78.
(SONG Zhen-qi.Practical ground pressure[M]. Xuzhou: China University of Mining and Technology Press, 1988: 41-78. (in Chinese)) |
[3] |
何满潮. 深部软岩工程的研究进展与挑战[J]. 煤炭学报, 2014, 39(8): 1409-1417.
(HE Man-chao.Progress and challenges of soft rock engineering in depth[J]. International Journal of Coal Science & Technology, 2014, 39(8): 1409-1417. (in Chinese)) |
[4] |
张东升, 茅献彪, 马文顶. 综放沿空留巷围岩变形特征的试验研究[J]. 岩石力学与工程学报, 2002, 21(3): 331-334.
(ZHANG Dong-sheng, MAO Xian-biao, MA Wen-ding.Experimental study on surrounding rock deformation characteristics of gob-side entry retaining in fully-mechanized caving face[J]. International Journal of Coal Science & Technology, 2002, 21(3): 331-334. (in Chinese)) |
[5] |
康红普, 牛多龙, 张镇, 等. 深部沿空留巷围岩变形特征与支护技术[J]. 岩石力学与工程学报, 2010, 29(10): 1977-1986.
(KANG Hong-pu, NIU Duo-long, ZHANG Zhen, et al.Deformation characteristics of surrounding rock and supporting technology of gob-side entry retaining in deep coal mine[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(10): 1977-1986. (in Chinese)) |
[6] |
何满潮, 曹伍富, 单仁亮, 等. 双向聚能拉伸爆破新技术[J].岩石力学与工程学报, 2003, 22(12): 2047-2051.
(HE Man-chao, CAO Wu-fu, SHAN Ren-liang, et al.New blasting technology-bilateral cumulative tensile explosion[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(12): 2047-2051. (in Chinese)) |
[7] |
马立强, 张东升, 王红胜, 等. 厚煤层巷内预置充填带无煤柱开采技术[J]. 岩石力学与工程学报, 2010, 29(4): 675-679.
(MA Li-qiang, ZHANG Dong-sheng, WANG Hong-sheng, et al.Mining technology with preset packing body in roadway for thick coal seam without coal pillars[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(4): 675-679. (in Chinese)) |
[8] |
柏建彪, 周华强, 侯朝炯, 等. 沿空留巷巷旁支护技术的发展[J]. 中国矿业大学学报, 2004, 33(2): 183-186.
(BAI Jian-biao, ZHOU Hua-qiang, HOU Chao-jiong, et al.Development of support technology beside roadway in goaf-side entry retaining for next sublevel[J]. Journal of China University of Mining and Technology, 2004, 33(2): 183-186. (in Chinese))) |
[9] |
华心祝, 马俊枫, 许庭教. 锚杆支护巷道巷旁锚索加强支护沿空留巷围岩控制机理研究及应用[J]. 岩石力学与工程学报, 2005, 24(12): 2107-2112.
(HUA Xin-zhu, MA Jun-feng, XU Ting-jiao.Study on controlling mechanism of surrounding rocks of gob-side entry with combination of roadside reinforced cable supporting and roadway bolt supporting and its application[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(12): 2107-2112. (in Chinese)) |
[10] |
史红, 姜福兴. 综放采场上覆岩厚层坚硬岩层破断规律的分析及应用[J]. 岩土工程学报, 2006, 28(4): 525-528.
(SHI Hong, JIANG Fu-xing.Analysis on rupture of hard and massive overlying strata in fully-mechnized sublevel caving face[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(4): 525-528. (in Chinese)) |
[11] |
谭云亮, 蒋金泉. 采场坚硬顶板断裂步距的板极限分析[J]. 山东矿业学院学报, 1989, 8(3): 21-26.
(TAN Yun-liang, JIANG Jin-quan.The plate limit analysis of the fracture length of hard roof back of the coalface[J]. Journal of Shandong Mining Institute, 1989, 8(3): 21-26. (in Chinese)) |
[12] |
黄艳利, 张吉雄, 巨峰. 巷旁充填沿空留巷技术及矿压显现规律[J]. 西安科技大学学报, 2009, 29(5): 515-520.
(HUANG Yan-li, ZHANG Ji-xiong, JU Feng.Technology of roadside packing in gob-side entry retaining and law of rock pressure[J]. Journal of Xi°an University of Science and Technology, 2009, 29(5): 515-520. (in Chinese)) |
[13] |
郭志飚, 王将, 曹天培, 等. 薄煤层切顶卸压自动成巷关键参数研究[J]. 中国矿业大学学报, 2016, 29(5): 515-520.
(GUO Zhi-biao, WANG Jiang, CAO Tian-pei, et al.Research on key parameters of gob-side entry retaining automatically formed by roof cutting and pressure release in thin coal seam mining[J]. Journal of China University of Mining and Technology, 2016, 45(5): 879-885. (in Chinese)) |
[1] | SUN Rui, YUAN Xiao-ming. Holistic equivalent linearization approach for seismic response analysis of soil layers[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(4): 603-612. DOI: 10.11779/CJGE202104002 |
[2] | LI Yong-qiang, JING Li-ping, SHAN Zhen-dong, ZHANG Feng. Nonlinear ground response based on the theory of wave propagation in two-phase media[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(11): 1986-1991. DOI: 10.11779/CJGE201511007 |
[3] | LI Xiao-jun. Adjustment of seismic ground motion parameters considering site effects in seismic zonation map[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 21-29. |
[4] | WANG Gang, ZHANG Jian-min, WEI Xing. Seismic response analysis of a subway station in liquefiable soil[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(10): 1623-1627. |
[5] | JIANG Tong, XING Hailing. An equivalent linear method considering frequency-dependent soil properties for seismic response analysis[J]. Chinese Journal of Geotechnical Engineering, 2007, 29(2): 218-224. |
[6] | CHANG Der wen, CHENG Shih hao, LIN Bor shiun. Seismic response analysis for simplified bridge pier foundation[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(4): 442-450. |
[7] | PAN Danguang, LOU Menglin, DONG Cong. Effect of vertical artificial boundary on seismic response of soil layer under traveling wave excitations[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(3): 308-312. |
[8] | Shannon H. Lee, Chih Ming Wu, Shen Yuan Lou, His Lin Lin. The seismic ground response of Taipei basin[J]. Chinese Journal of Geotechnical Engineering, 2002, 24(2): 154-158. |
[9] | Xin Hong bo, Finn W. D. Liam. Seismic Response Analysis of the 1976 Dashihe Tailings Dam[J]. Chinese Journal of Geotechnical Engineering, 1996, 18(4): 51-59. |
[10] | Wang Guangjun. The Incident Motion in Seismic Response Analysis of Layered Soils[J]. Chinese Journal of Geotechnical Engineering, 1984, 6(3): 75-85. |