Citation: | ZHANG Wen-jun, ZHANG Yun-pei, SONG Xiao-long. Numerical study on mechanical behavior of bent bolted connection in shield tunnel under effect of preload[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 203-206. DOI: 10.11779/CJGE2017S2049 |
[1] |
王 湛. 软土地层中盾构隧道结构沉降与变形机制分析[D]. 杭州: 浙江大学, 2013. (WANG Zhan. Settlement and failure mechanism of shield tunnel in soft soil area[D]. Hangzhou: Zhejiang University, 2013. (in Chinese))
|
[2] |
张建刚, 何 川. 复杂接缝面管片接头的力学性能数值分析[J]. 地下空间与工程学报, 2013, 9(4): 1350-1354. (ZHANG Jian-gang, HE Chuan. Numerical analysis of mechanical property of shield tunnel segmental joint with complex interface[J]. Chinese Journal of Underground Space and Engineering, 2013, 9(4): 1350-1354. (in Chinese))
|
[3] |
吴 彪. 深圳地铁7 m盾构管片及螺栓受力现场测试及分析[D]. 北京: 北京交通大学, 2015. (WU Biao. Field test and analysis on a 7 m shield segment and bolt’ mechanics characteristic in Shenzhen metro engineering project[D]. Beijing: Beijing JiaoTong University, 2015. (in Chinese))
|
[4] |
方恩权, 杨玲芝, 李晓军, 等. 地铁盾构隧道纵缝接头极限张开量研究[C]// 2014中国青岛城市轨道交通管理和技术创新研讨会论文集. 2014. (FANG En-quan, YANG Ling-zhi LI Xiao-jun, et al. The study of subway shield tunnel longitudinal seam joint limit opening[C]// Seminar papers of Qingdao China urban rail transit conference on management and technology, 2014. (in Chinese))
|