WU Jiang-bin, WANG Xiang-jun, SONG Qing-jun. Application of foundation reinforcement by anchor-jacked piles under low clearance[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 162-165. DOI: 10.11779/CJGE2017S2040
Citation: WU Jiang-bin, WANG Xiang-jun, SONG Qing-jun. Application of foundation reinforcement by anchor-jacked piles under low clearance[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 162-165. DOI: 10.11779/CJGE2017S2040

Application of foundation reinforcement by anchor-jacked piles under low clearance

More Information
  • Received Date: August 01, 2017
  • Published Date: December 19, 2017
  • For the a building with 13 floors high and no basemnt located in Shanghai, short leg shear wall system is used for the superstructure, and the foundation beams with precast tubular piles are used to be the foundation type. Before service of the project, may soils are pulled behind the building, and large deformation of the building is induced. For safety consideration, anchor-jacked piles are used to be as the foundation reinforcement. The steel pipe piles are used, which are the same as the existing ones. The total number is 116. In order to strengthen the rigidity of the original foundation and to make it easier for pile layout and load transfer, the raft with thickness of 700 mm is hoped to connect the existing foundation beams and the new piles. The steel pipe piles are located under the raft, and the raft will be the counterforce structure for the anchor-jacked pile. The connection node between piles and raft and that between raft and the existing foundation beams are proposed herein. The equipment is reformed to realize the construction of anchor-jacked piles under the clearance less than 2.5 m. So far, the maxium settlement of the building is about 10 mm, which shows the effect of the reinforcement by the anchor-jacked piles is remarkable.
  • [1]
    贾 强, 应惠清, 张 鑫. 锚杆静压桩技术在既有建筑物增设地下空间中的应用[J]. 岩土力学, 2009, 30(7): 2053-2057. (JIA Qiang, YING Hui-qing, ZHANG Xin. Construction of basement in existing buildings by static bolt-pile[J]. Rock and Soil Mechanics, 2009, 30(7): 2053-2057. (in Chinese))
    [2]
    邱 磊. 既有建筑采取锚杆静压桩结合堆载压重综合纠偏方法的研究[D]. 武汉: 武汉科技大学, 2011. (QIU Lei. The comprehensive correcting method research of existing building with anchor static pile combined with surcharge preloading[D]. Wuhan: Wuhan University of Science and Technology, 2011. (in Chinese))
    [3]
    刘毓氚, 陈福全. 锚杆静压桩在危险建筑物加固中的应用研究[J]. 岩石力学与工程学报, 2002, 21(1): 130-132. (LIU Yu-chuan, CHEN Fu-quan. Application research on static bolt-pile reinforcement for dangerous building[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(1): 130-132. (in Chinese))
  • Cited by

    Periodical cited type(10)

    1. 张盛行,汤雷,朱春光,石蓝星,明攀. 瞬变电磁探测土质堤坝渗漏病害的正演模拟与工程应用. 水利水电技术(中英文). 2025(S1): 392-397 .
    2. 施晓萍,周柏兵,郭庆鑫,李家群. 机载激光雷达在堤防隐患巡查试验中的应用. 水利发展研究. 2024(01): 86-93 .
    3. 黄曙光. 英德庄洲防洪堤水毁应急抢险修复策略. 云南水力发电. 2024(03): 99-102 .
    4. 涂建伟,蒋德成,崔家仲,何孟芸,贾刚. 面向岸堤坍塌全过程的应急防护措施与装置. 人民长江. 2024(04): 200-206 .
    5. 薛凯喜,李明吉,曹凯,胡艳香. 鄱阳湖圩堤管涌险情分析与防治措施. 河北工程大学学报(自然科学版). 2024(02): 95-104 .
    6. 高玉峰,王玉杰,张飞,姬建,陈亮,倪钧钧,张卫杰,宋健,杨尚川. 边坡工程与堤坝工程研究进展. 土木工程学报. 2024(08): 97-118 .
    7. 陈昱行,高至飞,胡朝鹏,宋国策. 基于无人机多模态数据的铁路防洪隐患排查系统研发. 铁道勘察. 2024(05): 156-162 .
    8. 蒋水华,陈颖霞,熊威,李彧玮,常志璐,李锦辉,李文欢. 堤防工程险情风险评估与管控研究进展. 人民珠江. 2024(11): 1-13 .
    9. 刘阳,涂善波,李亚楠. 双线盾构隧道穿越影响下的黄河堤防沉降监测研究. 陕西水利. 2023(10): 135-138 .
    10. 涂善波,刘阳. 基于多源监测技术的穿黄隧道堤防安全影响评价. 水科学与工程技术. 2023(05): 73-76 .

    Other cited types(3)

Catalog

    Article views (322) PDF downloads (268) Cited by(13)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return