• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
ZHENG Gang, CUI Tao, CHENG Xue-song, SUN Ji-bin, GE Long-bo. Introduction and analysis of an accident in a shield tunnel[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 132-135. DOI: 10.11779/CJGE2017S2033
Citation: ZHENG Gang, CUI Tao, CHENG Xue-song, SUN Ji-bin, GE Long-bo. Introduction and analysis of an accident in a shield tunnel[J]. Chinese Journal of Geotechnical Engineering, 2017, 39(z2): 132-135. DOI: 10.11779/CJGE2017S2033

Introduction and analysis of an accident in a shield tunnel

More Information
  • Received Date: August 01, 2017
  • Published Date: December 19, 2017
  • The right line tunnel is leaked and the segments are damaged due to an accident happening to TBM tunneling on running section in a city. The general situations of the project, the accident process and the emergency measures are introduced. Besides, the monitoring data of surface subsidence and segment deformation are analyzed. The correction measures should be carried out slowly to avoid damage to the completed segments.
  • [1]
    黄润秋, 戚国庆. 地铁隧道盾构法施工对环境的影响研究[J]. 岩石力学与工程学报, 2003, 23(增刊1): 2464-2468. (HUANG Run-qiu, QI Guo-qing. Study on the influence of subway by shield tunneling on environment[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 23(S1): 2464-2468. (in Chinese))
    [2]
    傅德明, 周文波. 土压盾构技术在我国地铁隧道工程中的应用和发展[J]. 岩石力学与工程学报, 2004, 23(增刊2): 4888-4892.(FU De-ming, ZHOU Wen-bo. Application and development of EPB shield tunneling in metro tunnel projects in China[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(S2): 4888-4892. (in Chinese))
    [3]
    方江华, 张志红, 张景钰. 人工冻结法在上海轨道交通四号线修复工程中的应用[J]. 土木工程学报, 2009, 42(8): 124-128. (FANG Jiang-hua, ZHANG Zhi-hong, ZHANG Jing-yu. Application of artificial freezing to recovering a collapsed tunnel in Shanghai metro No.4 line[J]. China Civil Engineering Journal, 2009, 42(8): 124-128. (in Chinese))
    [4]
    白 云. 国内外重大地下工程事故与修复技术[M]. 北京:中国建筑工业出版社, 2012. (BAI Yun. Major accidents in underground engineering and repair technology at home and abroad[M]. Beijing: China Architecture and Building Press, 2012.(in Chinese))
    [5]
    陆 明, 秦 灏, 朱祖熹. 上海轨道交通9号线盾构区间隧道抢险修复工程介绍[J]. 中国建筑防水, 2007, 27(4): 27-30. (LU Ming, QIN Hao, ZHU Zu-xi. Introduction of shield tunnel emergency repair of Shanghai rail rapid transit No.9 line[J]. China Building Waterproofing, 2007, 27(4): 27-30. (in Chinese))
    [6]
    肖晓春, 袁金荣, 朱雁飞. 新加坡地铁环线C824标段失事原因分析(一)——工程总体情况及事故发生过程[J]. 现代隧道技术, 2009, 46(5): 66-72. (XIAO Xiao-chun, YUAN Jin-rong, ZHU Yan-fei. Causation analysis of the collapse on Singapore MRT circle line lot C824 (Part I)——Project background and process of collapse [J]. Modern Tunneling Technology, 2009, 46(5): 66-72. (in Chinese))
  • Cited by

    Periodical cited type(8)

    1. 王怀强,李孝波,王天虎,席书衡,宣雨童. 基于岩土竖向台阵开展场地地震反应研究的若干进展. 地震工程与工程振动. 2025(02): 50-63 .
    2. 范宏飞,王彦臻,陈炜昀,陈国兴,赵凯. 水平成层海床场地非线性地震反应的流-固弱耦合分析. 振动工程学报. 2025(04): 849-859 .
    3. 郭云峰. 岩土勘察中地震效应问题的研究. 科技与创新. 2023(13): 117-119+122 .
    4. 王永光,梁建文,巴振宁. 基于修正阻尼的土体非线性模型及其在Abaqus中的实现. 岩土力学. 2023(08): 2287-2296 .
    5. 陈国兴,夏高旭,王彦臻,金丹丹. 琼州海峡海床地震反应特性的一维非线性分析. 工程力学. 2022(05): 75-85 .
    6. 赵凯,夏高旭,王彦臻,赵丁凤,庄海洋,陈国兴. 土–地下结构相互作用的三维弱耦合有效应力分析法. 岩土工程学报. 2022(05): 861-869 . 本站查看
    7. 阮滨,吉瀚文,王苏阳,贺鸿俊,苗雨. 基于台阵观测的基岩地震动入射波分离方法及数值验证. 岩土力学. 2022(09): 2615-2623+2642 .
    8. 陈伟庚,刘洋,王栋,岳茂,张良. 西南山区铁路沿线反倾岩质边坡地震动力响应振动台试验研究. 铁道建筑. 2021(04): 93-96 .

    Other cited types(8)

Catalog

    Article views PDF downloads Cited by(16)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return