• 全国中文核心期刊
  • 中国科技核心期刊
  • 美国工程索引(EI)收录期刊
  • Scopus数据库收录期刊
ZENG Ge-hua, XIA Cai-chu. Effect of radial erection error of segments on waterproofness of segment rings of shield tunnels[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(11): 2017-2025. DOI: 10.11779/CJGE201611011
Citation: ZENG Ge-hua, XIA Cai-chu. Effect of radial erection error of segments on waterproofness of segment rings of shield tunnels[J]. Chinese Journal of Geotechnical Engineering, 2016, 38(11): 2017-2025. DOI: 10.11779/CJGE201611011

Effect of radial erection error of segments on waterproofness of segment rings of shield tunnels

More Information
  • Received Date: February 20, 2016
  • Published Date: November 19, 2016
  • Taking the segment rings of shield tunnel of Shanghai Metro Line 13 as a study case, the initial structure of segment rings with the worst waterproofness under various error cases is determined. The decrease of waterproofness is quantified through change of convergence of segment ring as its waterproofness fails. The results indicate that the radial erection error of segments causes the joint dislocation and external opening of waist joints simultaneously, and the latter is worse to the initial waterproofness than the former. As the waterproofness fails, the convergence of segment rings with the worst waterproofness in one joint error case is 1.53‰D, it is less than a half of that in the no error case, and the convergence further decreases as the number of erroneous joints increases. If there are more than three erroneous joints, the waterproofness of segment rings with the worst waterproofness will fail before they come out of shield rear. According to the above conclusions, some recommend actions are proposed for the quality control of segment erection during construction phase and the waterproof monitoring of segment rings during service phase.
  • [1]
    GB50446—2008 盾构法隧道施工与验收规范[S]. 2008. (GB50446—2008 Code for construction and acceptance of shield tunneling method[S]. 2008. (in Chinese))
    [2]
    顾丽江. 考虑拼装误差影响下的软土盾构隧道变形控制标准研究[D]. 上海: 同济大学, 2011. (GU Li-jiang. Influence of installation errors on performance-based evaluation index of shield tunnel in soft clays[D]. Shanghai: Tongji University, 2011. (in Chinese))
    [3]
    彭益成. 盾构隧道管片结构非线性性态及流固耦合模型研究[D]. 上海: 同济大学, 2007. (PENG Yi-cheng. Study on non-linear properties and fluid-structure interaction model for segment structure of shield tunnel[D]. Shanghai: Tongji University, 2011. (in Chinese))
    [4]
    赵运臣, 肖龙鸽, 刘招伟, 等. 武汉长江隧道管片接缝防水密封垫设计与试验研究[J]. 现代隧道技术, 2008(增刊1): 144-149. (ZHAO Yun-chen, XIAO Long-ge, LIU Zhao-wei, et al. Experiment study and design on the watertight seal for reinforced concrete segment joint of Wuhan Yangtze River Tunnel[J]. Modern Tunnelling Technology, 2008(S1): 144-149. (in Chinese))
    [5]
    樊庆功. 隧道接缝弹性橡胶密封垫防水性能试验及有限元分析[D]. 上海: 同济大学, 2002. (FAN Qing-gong. Tunnel joints rubber gasket waterproof performance tests and finite element analysis[D]. Shanghai: Tongji University, 2002. (in Chinese))
    [6]
    ABAQUS Inc. Abaqus example problems manual, version 6.10[M]. Paris: Dassault Systemes Corp, 2010.
    [7]
    GENT A N. Engineering with rubber: how to design rubber components[M]. Munich: Hanser Publisher, 2012.
    [8]
    左 亮, 肖绯雄. 橡胶Mooney-Rivlin模型材料系数的一种确定方法[J]. 机械制造, 2008, 46(7): 38-40. (ZUO Liang, XIAO Fei-xiong. A method for determining the Mooney-Rivlin constitutive model parameters of rubber[J]. Machinery, 2008, 46(7): 38-40. (in Chinese))
    [9]
    BATTERMANN W, KÖHLER R. Elastomere federung, elastische Lagerungen: Grundlagen ingenieurmäßiger Berechnung und Konstruktion[M]. Berlin: W Ernst, 1982. (BATTERMANN W, KÖHLER R. Elastomeric suspension, elastic bearing: Basics engineering calculation and construction[M]. Berlin: W Ernst, 1982. (in German))
    [10]
    夏才初, 曾格华, 卞跃威. 盾构隧道管片环纵向接头抗弯刚度值的不动点迭代确定方法[J]. 岩石力学与工程学报, 2014, 33(5): 901-912. (XIA Cai-chu, ZENG Ge-hua, BIAN Yue-wei. Method for determining bending stiffness of shield tunnel segment rings longitudinal joint based on Fiex-point iteration[J]. Chinese Journal of Rock Mechanics, 2014, 33(5): 901-912. (in Chinese))
    [11]
    赵玉花, 沈日庚, 李 青. 软黏土侧压力系数 K 0 阶段性特征研究[J]. 岩土力学, 2008, 29(5): 1264-1268. (ZHAO Yu-hua, SHEN Ri-geng, LI Qing. Research on staged characteristics of lateral pressure coefficient K 0 of soft clay[J]. Rock and Soil Mechanics, 2008, 29(5): 1264-126. (in Chinese))
    [12]
    LI X J, YAN Z G, WANG Z, et al. Experimental and analytical study on longitudinal joint opening of concrete segmental lining[J]. Tunnelling and Underground Space Technology, 2015: 46:52-63.
    [13]
    DING W Q, PENG Y C, YAN Z G, et al. Full-scale testing and modeling of the mechanical behavior of shield TBM tunnel joints[J]. Structural Engineering and Mechanics, 2013, 45(3): 333-350.
    [14]
    张厚美, 过 迟, 付德明. 圆形隧道装配式衬砌接头刚度模型研究[J]. 岩土工程学报, 2000, 22(3): 309-313. (ZHANG Hou-mei, Guo Chi, FU De-ming. A study on the stiffness model of circular tunnel prefabricated lining[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(3): 309-313. (in Chinese))
    [15]
    ITA. Guidelines for the design of shield tunnel lining (ITAWG 2 report)[J]. Tunnelling and Underground Space Technology, 2000, 15(3): 303-331.
    [16]
    GB50010—2010混凝土结构设计规范[S]. 2010. (GB50010—2010 Code for design of concrete structures[S]. 2010. (in Chinese))
    [17]
    朱祖熹. 上海地铁1号线盾构隧道衬砌防水技术述评[J].地下工程与隧道, 1993, 4: 54-60. (ZHU Zu-xi. Ling waterproof technology review of the of Shanghai Metro Line1 shield tunnel[J]. Underground Engineering and Tunnels, 1993, 4: 54-60. (in Chinese))
  • Cited by

    Periodical cited type(0)

    Other cited types(1)

Catalog

    Article views PDF downloads Cited by(1)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return