LI Jun-yu, QIAN Jian-gu, RU Zhi-min, GAO Jie, HUANG Li-jun. Three-dimensional method for response of embedded pipelines to earthfill load[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(zk2): 65-69. DOI: 10.11779/CJGE2015S2014
Citation: LI Jun-yu, QIAN Jian-gu, RU Zhi-min, GAO Jie, HUANG Li-jun. Three-dimensional method for response of embedded pipelines to earthfill load[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(zk2): 65-69. DOI: 10.11779/CJGE2015S2014

Three-dimensional method for response of embedded pipelines to earthfill load

More Information
  • Received Date: March 25, 2015
  • Published Date: July 24, 2015
  • The earthfill load causes soil motion and further produces-additional deformation and stress on the embedded pipelines in the ground. The deformation and stress may damage the pipelines. To avoid the drawbacks of three-dimensional numerical analysis, such as complex modeling and time consuming, a two-stage method (TSM) is proposed for determining the behavior of the adjacent pipelines caused by the earthfill load. Firstly, the additional deformation of soil mass due to the adjacent high fill is calculated by the layered elastic half-space theory. Secondly, the governing differential equations are established based on the Winkler subgrade model and the finite difference method is used to solve the equations, and then the simplified method is derived. Finally, three-dimensional numerical analysis show that the calculated results of analytical solution are reasonable, and the proposed three-dimensional simplified method is able to analyze the influence of earthfill load on the adjacent pipeline buried in layered soils.
  • [1]
    MERLING Spangler, RICHARD Handy. Soil mechanics[M]. London: Intext Press, 1973.
    [2]
    CHIOU Y J, CHI S Y. Numerical modeling for buckling of buried pipelines induced by compressive ground failure[J]. Journal of the Chinese Institute of Engineers, 1996, 19(3): 321-332.
    [3]
    黄崇伟. 沟埋式输油管道管土相互作用分析[J]. 公路工程ISTIC, 2011, 36(2): 164-168. (HUANG Chong-wei. Theories on Mechanics and Pipe-soil Interaction Model of Channel-buried Pile[J]. Highway Engineering ISTIC, 2011, 36(2): 164-168. (in Chinese))
    [4]
    张陈蓉, 俞 剑, 黄茂松. 隧道开挖对邻近非连续接口地埋管线的影响分析[J]. 岩土工程学报, 2013, 35(6): 1018-1026. (ZHANG Chen-rong, YU Jian, HUANG Mao-song. Responses of adjacent underground jointed pipelines induced by tunneling[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(6): 1018-1026. (in Chinese))
    [5]
    AI Z-Y, YUE Z-Q, RHAM L-G, et al. Extended sneddon and muki solutions for multilayered elastic materials[J]. International Journal of Engineering Science, 2002, 20: 1453-1483.
    [6]
    俞 剑, 张陈蓉, 黄茂松. 被动状态下地埋管线的地基模量[J]. 岩石力学与工程学报, 2012, 31(1): 123-132. (YU Jian, ZHANG Chen-rong, HUANG Mao-song. Subgrade modulus of underground pipelines subjected to soil movements[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(1): 123-132. (in Chinese))
    [7]
    VESIC A B. Bending of beam resting on isotropic elasticsolid[J]. Journal of the Engineering Mechanics Division, ASCE, 1961, 87(2): 35-53.
    [8]
    BIOT M A. Bending of an infinite beam on an elastic foundation[J]. Journal of Applied Mechanics, ASME, 1937, 59: A1-A7.
    [9]
    余占奎. 软土盾构隧道纵向设计方法研究[D]. 上海: 同济大学, 2006. (YU Zhan-kui. Study on the longitudinal design method of shield tunnel in soft soil[D]. Shanghai: Tongji University, 2006. (in Chinese))
  • Cited by

    Periodical cited type(2)

    1. 高志傲,孔令伟,王双娇,黄珏皓,赵浩武. 循环荷载下不同裂隙方向饱和原状膨胀土动力特性试验研究. 岩土工程学报. 2025(04): 736-748 . 本站查看
    2. 简涛,孔令伟,柏巍,王俊涛,刘炳恒. 含水率对原状黄土小应变剪切模量影响的试验研究. 岩土工程学报. 2022(S1): 160-165 . 本站查看

    Other cited types(1)

Catalog

    Article views PDF downloads Cited by(3)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return