Citation: | CAI Zheng-yin, HOU Wei, ZHOU Jian, XU Guang-ming. Numerical analysis of 200000-tonnage sheet-pile wharf with relieving platform[J]. Chinese Journal of Geotechnical Engineering, 2015, 37(2): 218-224. DOI: 10.11779/CJGE201502002 |
[1] |
刘永绣, 吴荔丹, 徐光明, 等. 遮帘式板桩码头工作机制[J]. 水利水运工程学报, 2006(2): 8-12. (LIU Yong-xiu, WU Li-dan, XU Guang-ming, et al. Working mechanism of sheet pile wharf with barrier piles[J]. Hydro-Science and Engineering, 2006(2): 8-12. (in Chinese))
|
[2] |
刘永绣. 板桩和地下墙码头的设计理论和方法[M]. 北京: 人民交通出版社, 2006. (LIU Yong-xiu. Design theories and methods for wharfs with sheet piles and diaphragms[M]. Beijing: China Communications Press, 2006. (in Chinese))
|
[3] |
李景林, 王剑平, 蔡正银, 等. 遮帘桩方案改造板桩码头离心模型试验研究[J]. 岩土工程学报, 2006, 28(8): 978-982. (LI Jing-lin, WANG Jian-ping, CAI Zheng-yin, et. al. Centrifuge model tests on sheet-piled wharf renovated by barrier pile project[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(8): 978-982. (in Chinese))
|
[4] |
刘延致. 卸荷式板桩码头结构受力分析及优化研究[D]. 青岛: 中国海洋大学, 2012. (LIU Yan-zhi. Force analysis and optimization of sheet-pile wharfs with relieving platform[D]. Qingdao: Ocean University of China, 2012. (in Chinese))
|
[5] |
龚丽飞. 卸荷式地下连续墙板桩码头结构与土相互作用研究[D]. 南京: 南京水利科学研究院, 2007. (GONG Li-fei. Researches on structure-soil of sheet-pile wharfs with relieving platform and diaphragm wall[D]. Nanjing: Nanjing Hydraulic Research Institure, 2009. (in Chinese))
|
[6] |
司海宝, 蔡正银, 俞缙. 遮帘式板桩码头结构与土共同作用3D数值模拟分析[J]. 土木工程学报, 2012, 45(5): 182-190. (SI Hai-bao, CAI Zheng-yin, YU Jin. 3D Numerical modeling of pile-soil interaction for covered sheet-piled wharf[J]. China Civil Engineering Journal, 2012, 45(5): 182-190. (in Chinese))
|