Citation: | LIU Ji-guo, GUO Xiao-hong, CHENG Yong, WANG Qi-tong, CHEN Wei-zhong. Floatation-resistant stability of open excavation tunnels in offshore shallow stratum[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 274-278. DOI: 10.11779/CJGE2014S2048 |
[1] |
中交第二公路勘察设计研究院有限公司. 港珠澳大桥珠海连接线控制性工程拱北隧道施工图设计[R]. 武汉: 中交第二公路勘察设计研究院有限公司, 2013. (CCCC Second Highway Consultants Co, Ltd. Design of construction drawing to key project gongbei tunnel of Zhuhai connecting line of Hongkong-Zhuhai-Macao Bridge[R]. Wuhan: CCCC Second Highway Consultants Co, Ltd. 2013. (in Chinese))
|
[2] |
寿 旋, 徐肖华, 孙苗苗, 等. 软土地区深基坑被动土体加固高度改进研究 [J]. 岩土工程学报, 2010, 32(增刊): 104-108. (SHOU Xuan, XU Xiao-hua, SUN Miao-miao, et al. Reinforcement height of passive zone of deep foundation pits in soft clay regions[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(增刊): 104-108. (in Chinese))
|
[3] |
范 巍. 大面积深基坑开挖过程中桩基受力特性研究[D].上海: 上海交通大学, 2007. (FAN Wei. Behavior of pile foundation during large-scale deep excavation[D]. Shanghai: Shanghai Jiaotong University, 2007. (in Chinese))
|
[4] |
范 巍, 王建华, 陈锦剑. 连续墙与土体接触特性对深基坑变形分析的影响[J]. 上海交通大学学报,2006, 40(12): 2118-2121. (FAN Wei, WANG Jian-hua, CHEN Jin-jia. The evaluation of deformation induced by excavation considering the properties of diaphragm-soil interface[J]. Journal of Shanghai Jiaotong University, 2006, 40(12): 2118-2121. (in Chinese))
|