Citation: | YUAN Jing, CHEN Jin-you, LIU Xing-wang, HE Xiao-long. Control technology of interface retaining structures of multiple adjacent deep excavations in silty sand[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk2): 99-105. DOI: 10.11779/CJGE2014S2017 |
[1] |
.DB 33/T1008—2000 建筑基坑工程技术规程[S]. 2000. (DB 33/T1008—2000 Code for technique of building foundation excavation engineering[S]. 2000. (in Chinese))
|
[2] |
曹国强, 刘兴旺. 杭州火车东站基坑围护设计说明[R]. 杭州: 浙江省建筑设计研究院, 2010. (CAO Guo-qiang, LIU Xing-wang. Excavation design of hHangzhou east train station[R]. Hangzhou: Zhejiang Province Architectural Design and Research Institute, 2010. (in Chinese))
|
[3] |
袁 静, 刘兴旺. 杭州火车东站西广场基坑围护设计说明[R]. 杭州: 浙江省建筑设计研究院, 2010. (YUAN Jing, LIU Xing-wang. Excavation design of West Plaza[R]. Hangzhou: Zhejiang Province Architectural Design and Research Institute, 2010. (in Chinese))
|
[4] |
李 瑛, 陈金友. 大面积卸荷对下卧地铁隧道影响的数值分析[J]. 岩土工程学报, 2013, 35(增刊2): 643-646. (LI Ying, CHEN Jin-you. Numerical analysis of effect of large-scale unloading on underlying shield tunnels[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(S2): 643-646. (in Chinese))
|