Citation: | DAI Ming, DENG Min, ZHANG Zhi, WU Li-sheng. Design and construction processing example of inadequate embedded depth of retaining piles in deep excavation[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 225-230. DOI: 10.11779/CJGE2014S1039 |
[1] |
JGJ 120—2012 建筑基坑支护技术规程[S]. 2012. (JGJ 120—2012 Technical specification for retaining and protection of building foundation excavation[S]. 2012. (in Chinese))
|
[2] |
DB42/T 159—2012 基坑工程技术规程[S]. 2012. (DB42/T 159—2012 Technical specification for excavation engineering[S]. 2012. (in Chinese))
|
[3] |
QB/BY 10301—2003水泥搅拌桩施工工艺及质量验收标准[S]. 2003.
|
[4] |
GB 50086—2001锚杆喷射混凝土支护技术规范[S]. 2001. (GB 50086—2001 Specification for bolt-shotcrete support[S]. 2001. (in Chinese))
|