Citation: | ZHANG Yue-jin, ZENG Ji-wen. Dynamic monitoring and emergency treatment of deep foundation pit in ultra deep silt layer[J]. Chinese Journal of Geotechnical Engineering, 2014, 36(zk1): 202-207. DOI: 10.11779/CJGE2014S1035 |
[1] |
武汉红星美凯龙世博家居广场勘察报告[R]. 武汉: 中南勘察设计院(湖北)有限责任公司, (Wuhan Hongxingmeikailong Plaza Expo Home Furnishing Square investigation report[R]. Wuhan: South Central Survey and Design Institute (Hubei) Co Ltd, (in Chinese))
|
[2] |
武汉红星美凯龙世博家居广场基坑监测报告[R]. 武汉: 武汉建工, (Wuhan Hongxingmeikailong Plaza Home Furnishing Square pit monitoring report[R]. Wuhan: Wuhan Construction, (in Chinese))
|
[3] |
G07及修07(7-7剖面土锚)设计及变更图纸[R]. 武汉: 武汉华太岩土工程有限公司, (G07 and 07 (7-7 profile soil anchor) design and drawing changes[R]. Wuhan: Wuhan China Taiyan Soil Engineering Co Ltd, (in Chinese))
|
[4] |
张跃进. 旋喷锚索施工钻体: 中国, ZL201320787515.1[P]. 2014-06-11. (ZHANG Yue-jin. Jet anchor construction drill: China, ZL201320787515.1[P]. 2014-06-11. (in Chinese))
|