MA Chong-wu, MU Qing-song. Yield failure process of vertical jambs in Jinchuan No. 2 Mine Area[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 459-463.
Citation: MA Chong-wu, MU Qing-song. Yield failure process of vertical jambs in Jinchuan No. 2 Mine Area[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(zk2): 459-463.

Yield failure process of vertical jambs in Jinchuan No. 2 Mine Area

More Information
  • Received Date: June 17, 2013
  • Published Date: November 24, 2013
  • In Jinchuan No. 2 Mine Area, the backfilled mining in large hypogeal area without jambs have resulted in the two mining levels at two different altitudes, respectively above and under the altitude of 1150 m, and the ore-body between them is called a horizontal jamb. Each of the two mining levels is distinguished seven mechanized panels along the lode from east to west. Under the altitude of 1150 m, between the third and the forth panel on the down mining level, a vertical jamb 20~30 m in width in the lode direction isn’t mined for preventing the horizontal jamb from submergence. The vertical jamb in 2004 has already reached 50 m in height, the mine engineers wondered whether or not the vertical jamb would be allowed to become higher without mining in the future. A three-dimensional finite element mechanical model is established to simulate the yield failure process of the horizontal and vertical jambs within the changed tectonic stress field caused by continuous mining. The results indicate that the yield failure process begins at the centre, and then spreads to the top and the bottom within the vertical jamb, and in 2005, almost all part within the vertical jamb attains the failure situation. Based on the simulated results, it is considered that the support effects of the vertical jamb on the horizontal jamb and on the hanging wall and footwall rocks will gradually weaken because of the failure of the vertical jamb. Because the failure of the vertical jamb cannot evidently affect the distribution of the tectonic stress field in the mine area, it is suggested that the vertical jamb should be canceled on the down mining level in the future deeper exploitation besides the upper existent part.
  • [1]
    苏生瑞, 黄润秋, 王士天. 断裂构造对地应力场的影响及其工程应用[M]. 北京: 科学出版社, 2002. (SU Sheng-rui, HUANG Run-qiu, WANG Shi-tian. The effect of the faults on the tectonic stress field and the engineering application [M]. Beijing: Science Press, 2002. (in Chinese))
    [2]
    北京大学. 金川矿区断层泥特征及其与巷道变形关系的研究[R]. 金昌: 金川集团有限公司, 1985. (Peking University. Relation of character of fault clay and distortion of laneway in Jinchuan diggings[R]. Jinchang: Jinchuan Group LTD, 1985. (in Chinese))
    [3]
    王福玉, 高 谦, 张周平. 金川矿区地应力规律与人工神经网络预测研究[J]. 岩石力学与工程学报, 2003, 22(增刊2): 2601-2606. (WANG Fu-yu, GAO Qian, ZHANG Zhou-ping. Law of in-situ stress in Jinchuan diggings and research on prediction model based on artificial neural network[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22(S2): 2601-2606. (in Chinese))
    [4]
    刘 高, 韩文峰, 聂德新. 金川矿区地应力场特征[J]. 天津城市建设学院学报, 2002, 8(2): 81-85. (LIU Gao, HAN Wen-feng, NIE De-xin. Characteristics of earth stress field of Jinchuan Mine Area[J]. Journal of Tianjin Institute of Urban Construction, 2002, 8(2): 81-85. (in Chinese))
    [5]
    高 谦, 刘同有, 方祖烈. 金川二矿区深部开采潜在问题与优化控制技术研究[J]. 有色金属, 2004, 56(4): 2-5, 14. (GAO Qian, LIU Tong-you, FANG Zu-lie. Latency issue and optimization of controlled technique of deep mining areas for No. 2 mining area of Jinchuan Mine[J]. Nonferrous Metals, 2004, 56(4): 2-5, 14. (in Chinese))
    [6]
    张 忠. 金川二矿区1098 m分段巷道稳定性研究[J]. 岩石力学与工程学报, 2003, 22(增刊2): 2620-2624. (ZHANG Zhong. Stability research of roadway of 1098m level in deposit 2 of Jinchuan[J]. Chinese Journal of Rock Mechanics and Engineering, 2003, 22 (S2): 2620-2624. (in Chinese))
    [7]
    路世豹, 李 晓, 马建青, 等. 金川二矿区地下巷道变形监测分析及应用[J]. 岩石力学与工程学报, 2004, 23(3): 488-492. (LU Shi-bao, LI Xiao, MA Jian-qing, et al. Interpretation of deformation monitoring of underground roadways and its application to No. 2 diggings of Jinchuan mine[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(3): 488-492. (in Chinese))
    [8]
    蔡美峰, 孔广亚. 金川二矿区深部开采稳定性分析和采矿设计优化研究[J]. 中国矿业, 1998, 7(5): 33-36. (CAI Mei-feng, KONG Guang-ya. Analysis of stability of deep mining areas and optimization of mining design for No. 2 mining area of Jinchuan Mine[J]. Journal of China Mining , 1998, 7(5): 33-36. (in Chinese))
    [9]
    高 谦, 岳 斌, 把多恒, 等. 金川三矿区主副井工程变形分析与稳定性评价研究[R]. 金昌: 金川集团有限公司, 2005. (GAO Qian, YUE Bin, BA Duo-heng, et al. Deformation analysis and stability estimation of the engineering of main-well and vice-well in Jinchuan Third Diggings[R]. Jinchang: Jinchuan Group LTD, 2005. (in Chinese))
    [10]
    马崇武, 慕青松, 苗天德, 等. 金川二矿区上盘巷道工程的变形破坏与水平矿柱的关系[J]. 矿业研究与开发, 2007, 27(6): 13-16. (MA Chong-wu, MU Qing-song, MIAO Tian-de, et al. Effect of the level pillar on the deformation and failure of hanging wall roadway in Jinchuan No.2 mine area[J]. Mining Research and Development, 2007, 27(6): 13-16. (in Chinese))
    [11]
    蔡美峰, 乔 兰, 于 波, 等. 金川二矿区深部地应力测量及其分布规律研究[J]. 岩石力学与工程学报, 1999, 18(4): 414-418. (CAI Mei-feng, QIAO Lan, YU Bo, et al. Results and analysis of in-situ stress measurement at deep position of No. 2 mining area of Jinchuan Nichkel mine[J]. Chinese Journal of Rock mechanics and Engineering, 1999, 18(4): 414-418. (in Chinese))
    [12]
    蔡美峰, 高华林, 孔广亚. 金川二矿区二期工程无矿柱大面积连续开采稳定性三维有限元分析及其子课题深部工程地质分区和岩体分类[R]. 北京: 北京科技大学, 1996. (CAI Mei-feng, GAO Hua-lin, KONG Guang-ya. The three-dimensional FEM analysis on the stability of big area without jambs mining, the subarea of the deep engineering geology and the sort of rock in the Jinchuan No. 2 diggings [R]. Beijing: University of Science and Technology Beijing, 1996. (in Chinese))