Citation: | MAO Hong-mei, CHEN Kui, FENG Huan-huan. Rock-breaking mechanism of TBM with different types of cutter tools and estimation of thrust force[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(9): 1627-1633. |
[1] |
苏翠侠, 王燕群, 蔡宗熙, 等. 盾构刀盘掘进载荷的数值模拟[J]. 天津大学学报, 2011, 44(6): 522-528. (SU Cui-xia, WANG Yan-qun, CAI Zong-xi, et al. Numerical simulation of excavation load on cutterhead in shield tunneling machine[J]. Journal of Tianjin University, 2011, 44(6): 522-528. (in Chinese))
|
[2] |
李晓豁, 姜丽丽. 掘进机截割硬岩的载荷模拟研究[J]. 中国工程机械学报, 2008, 6(4): 415-417+427. (LI Xiao-huo, JIANG Li-li. Excavator loading simulation for hard-rock cutting[J]. Chinese Journal of Construction Machinery, 2008, 6(4): 415-417+427. (in Chinese))
|
[3] |
吕 强, 傅德明. 土压平衡盾构掘进机刀盘扭矩模拟试验研究[J]. 岩石力学与工程学报, 2006(增刊1): 3137-3143. (LÜ Qiang, FU De-ming. Research on torque of cutterhead for earth pressure balance shield with simulating experimental[J]. Chinese Journal of Rock Mechanics and Engineering, 2006(S1): 3137-3143. (in Chinese))
|
[4] |
沈建奇, 金先龙, 杨建刚, 等. 盾构机刀盘掘削动态数值模拟[J]. 上海交通大学学报, 2009, 43(6): 1017-1020. (SHEN Jian-qi, JIN Xian-long, YANG Jian-gang, et al. Dynamic numerical simulation of excavation in shield tunnelling[J]. Journal of Shanghai Jiao Tong University, 2009, 43(6): 1017-1020. (in Chinese))
|
[5] |
邢 彤, 龚国芳, 杨华勇. 盾构刀盘驱动扭矩计算模型及实验研究[J]. 浙江大学学报(工学版), 2009, 43(10): 1794-1800. (XING Tong, GONG Guo-fang, YANG Hua-yong. Torque calculation model of cutting head in shield machine and experimental study[J]. Journal of Zhejiang University (Engineering Science), 2009, 43(10): 1794-1800. (in Chinese))
|
[6] |
蒲 毅, 刘建琴, 郭 伟, 等. 土压平衡盾构机刀盘刀具布置方法研究[J]. 机械工程学报, 2011, 47(15): 161-168. (PU Yi, LIU Jian-qin, GUO Wei, et al. Research on cutting tool layout method of earth pressure balance shield[J]. Journal of Mechanical Engineering, 2011, 47(15): 161-168. (in Chinese))
|
[7] |
郭 伟, 胡 竟, 王 磊, 等. 基于CFD的土压平衡盾构刀盘开口分布特征研究[J]. 机械工程学报, 2012, 48(17): 144-151. (GUO Wei, HU Jing, WANG Lei, et al. Study on the opening distribution characteristics of earth pressure balance shield cutter head based on CFD[J]. Journal of Mechanical Engineering, 2012, 48(17): 144-151. (in Chinese))
|
[8] |
SMITS, ANTHONY Robert. The excavation of hard rock by disc and roller cutter[D]. Sydney: University of New South Wales, 1980.
|
[9] |
OZDEMIR L, RMILLE R. Cutter performance study for deep based missile egress excavation[D]. Golden: Earth Mechanics Institute Colorado School of Mines, 1986, 12(23): 105-132.
|
[10] |
管会生, 高 波. 盾构刀盘扭矩估算的理论模型[J]. 西南交通大学学报, 2008, 43(2): 213-217, 226. (GUAN Hui-sheng, GAO Bo. Theoretical model for estimation of cutter head torque in shield tunneling[J]. Journal of Southwest Jiaotong University, 2008, 43(2): 213-217, 226. (in Chinese))
|
[11] |
朱合华, 徐前卫, 廖少明, 等. 土压平衡盾构施工的顶进推力模型试验研究[J]. 岩土力学, 2007, 28(8): 1587-1594. (ZHU He-hua, XU Qian-wei, LIAO Shao-ming, et al. Experimental study on thrust force during tunnel excavation with earth pressure balance shield machine[J]. Rock and Soil Mechanics, 2007, 28(8): 1587-1594. (in Chinese))
|
[12] |
王洪新. 土压平衡盾构刀盘扭矩计算及其与盾构施工参数关系研究[J]. 土木工程学报, 2009, 42(9): 109-113. (WANG Hong-xin. Calculation of cutterhead torque for EPB shield and the relationship between cutterhead torque and shield driving parameters[J]. China Civil Engineering Journal, 2009, 42(9): 109-113. (in Chinese))
|
[13] |
徐小荷, 余 静. 岩石破碎学[M]. 北京: 煤炭工业出版社, 1984. (XU Xiao-he, YU Jing. Fragmentation of rocks[M]. Beijing: Coal Industry Publishing House, 1984. (in Chinese)))
|
[14] |
中国科学技术情报研究所. 岩石掘进机译文集(第二集)[M]. 北京: 科学技术文献出版社, 1978. (Institute of Scientific and Technical Information of China. The translation groups of rock tunnel boring machine (Volume 2)[M]. Beijing: Scientific and Technical Documents Publishing House, 1978. (in Chinese))
|