Citation: | HUANG Shao-ming, YUE Jian-yong, HUANG Yu-ting. Design and practice of settlement-reducing embankment piles for soft ground treatment under large-area surface heaped load[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(7): 1228-1238. |
[1] |
BROMS B B. Precast piling practice[M]. London: Thamas Telford LTD, 1981.
黄绍铭,王迪民,裴 捷,等. 按沉降量控制的复合桩基设计方法(上)[J]. (工业建筑), 1992(7): 35-36.(HUANG Shao-ming,WANG Di-min,PEI Jie,et al. Design method of controlled-settlement composite piled foundation(Ⅰ)[J]. Industrial Construction, 1992(7): 35-36. (in Chinese)) 黄绍铭,王迪民,裴 捷,等. 按沉降量控制的复合桩基设计方法(下)[J]. (工业建筑), 1992(8): 41-44.(HUANG Shao-ming,WANG Di-min,PEI Jie,et al. Design method of controlled-settlement composite piled foundation(Ⅱ)[J]. Industrial Construction, 1992(8): 41-44. (in Chinese)) DGJ08—11—2010 上海市地基基础设计规范[S]. 2010.DGJ08—11—2010 上海市地基基础设计规范[S]. 2010. (DGJ08—11—2010 Foundation design code in Shanghai[S]. 2010. (in Chinese)) British Standards Institution. BS 8006. Code of practice for strengthened/reinforced soils and other fills[S]. London: British Standards Institution, 1995. Nordic Geotechnical Society. Nordic handbook. Reinforced soils and fills[S]. Stockholm: Nordic Geotechnical Society, 2002. Railway Technology Research Institute. The design and construction handbook of mixing piled foundation[S]. Tokyo. Railway Technology Research Institute, 2001. 周 镜,叶阳升,蔡德钩. 国外加筋垫层桩支承路基计算方法分析[J]. (中国铁道科学), 2007, 28(2): 1-6.(ZHOU Jing,YE Yang-sheng,CAI De-gou. Analysis of calculation method for foreign geosynthetic reinforced pile supported embankments[J]. China Railway Science, 2007, 28(2): 1-6. (in Chinese)) 刘国楠. 桩网地基的工作机理与设计方法[J]. (地基处理), 2010, 21(4): 4-18.(LIU Guo-nan. Working mechanism and design method for pile-net composite foundation[J]. Ground improvement, 2010, 21(4): 4-18 . (in Chinese)) 陈仁明,贾 宁,陈云敏. 桩承式加筋路堤受力机理及沉降分析[J]. (岩石力学与工程学报), 2005, 24(23): 4358-4367.(CHEN Ren-ming,JIA Ning,CHEN Yun-min. Mechanism and settlement analysis of pile-supported and geogrid-reinforced embankments[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(23): 4358-4367. (in Chinese)) 徐正中,吴德伦,陈仁明,等. 桩承式路堤技术机理及应用研究[C]// 第十届全国土力学及岩土工程学术会议论文集(中册)重庆: 重庆大学出版社, 2007: 401-408. (XU Zheng-zhong,WU De-lun,CHEN Ren-ming,et al. Research on application and technical mechanism of pile-supported embankments[C]// Proceedings of the 10th Chinese Conference on Soil Mechanics and Geotechnical Engineering(Ⅱ). Chongqing: Chongqing University Press2007: 401-408. (in Chinese)) JGJ 94—2008 建筑桩基技术规范[S]. 94—2008 建筑桩基技术规范[S]. 2008.(JGJ 94—2008 Technical code for building pile foundations[S]. 94—2008 Technical code for building pile foundations[S]. 2008. (in Chinese)) 童翊湘. 上海桩基础的使用经验和设计方法[M]. 上海: 华东电力设计院, 1979.(TONG Yi-xiang. Application experience and design method for pile foundation in Shanghai[M]. Shanghai: East China Electric Power Design Institute, 1979. (in Chinese)) 桩基工程手册编写委员会. 桩基工程手册[M].北京:中国建筑工业出版社, 1995.(Editorial Board of Pile Foundation Engineering Manual. Pile foundation engineering manual[M].Beijing:China Architecture & Building Press, 1995. (in Chinese)) |