Citation: | SUN Liang. Design and analysis of retaining structure for deep excavation of Banghua Global Plaza in Guangzhou[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 756-760. |
[1] |
DBJ 15—31—2003建筑地基基础设计规范[S]. 2003. (DBJ 15—31—2003 Design code for building foundation[S]. 2003. (in Chinese))
|
[2] |
GJB 02—98广州地区建筑基坑支护技术规定[S]. (GJB 02—98 Technical specification for retaining and protection of building foundation Exacavation in Guangzhou area[S]. (in Chinese))
|
[3] |
林 鹏, 王艳峰, 范志雄, 等. 双排桩支护结构在软土基坑工程中的应用分析[J]. 岩土工程学报, 2010, 32(增刊2): 331–334. (LIN Peng, WANG Yan-feng, FAN Zhi-xiong, et al. Application and analysis of retaining structure with double-row piles in soft ground excavation engineering[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(S2): 331–334. (in Chinese))
|
[4] |
郑 刚, 李 欣, 刘 畅, 等. 考虑桩土相互作用的双排桩分析[J]. 建筑结构学报, 2004(2): 99–106: (ZHENG Gang, LI Xin, LIU Chang, et al. Analysis of double-row piles in consideration of the pile-soil interaction[J]. Journal of Building Structures, 2004(2): 99–106. (in Chinese))
|
[5] |
吴 刚, 白 冰, 聂庆科. 深基坑双排桩支护结构设计计算方法研究[J]. 岩土力学, 2008(10): 2753–2757. (WU Gang, BAI Bing, NIE Qing-ke. Research on calculation method of double-row piles retaining structure for deep excavation[J]. Rock and Soil Mechanics, 2008(10): 2753–2757. (in Chinese))
|