XIN Xin, WAN Peng, SHEN Yuan-shun. Risk assessment of construction of excavations in areas of rock and soil[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 342-346.
    Citation: XIN Xin, WAN Peng, SHEN Yuan-shun. Risk assessment of construction of excavations in areas of rock and soil[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 342-346.

    Risk assessment of construction of excavations in areas of rock and soil

    More Information
    • Received Date: November 12, 2012
    • Published Date: November 12, 2012
    • With the acceleration of economic development and urbanization, some cities in rock areas, such as Qingdao, Dalian and Chongqing, has launched rail?transit?construction to improve the urban traffic conditions. Different from soft soil areas, construction risk of excavations of subway stations in rock areas is affected by various uncertain factors with random and fuzzy behaviors. Based on the subway station construction of Qingdao Subway Line No. 3 Project, a synthetic evaluation index system for excavation construction risk of subway stations in rock and soil areas is established by analyzing the factors that influence subway station construction with the fault tree method. A model of three-stage fuzzy synthetic evaluation on the basis of analytic hierarchy process and fuzzy method is adopted to assess excavation construction risk of the subway station. The analytical results show that the proposed method is practical and helpful to other similar projects.
    • [1]
      李 东. 青岛地区二元结构基坑“吊脚桩”支护设计数值分析研究[D]. 青岛: 中国海洋大学环境工程, 2009. (LI Dong. Numerical analysis on design of dualistic foundation pit with “end-suspended pile” in Qingdao[D]. Qingdao: Ocean University of China, 2009. (in Chinese))
      [2]
      DUZGUN H, EINSTEIN H H. Assessment and management of roof fall risks in underground coal mines[J]. Safety science, 2004, 42(1): 23–41.
      [3]
      EINSTEIN H H, MINES U S B O. Risk analysis for rock slopes in open pit mines[M]. NTIS, 1981.
      [4]
      EINSTEIN H H, KARAM K S. Risk assessment and uncertainties[C]. Essen: VGE, 2001: 457–488.
      [5]
      黄宏伟, 边亦海. 深基坑工程施工中的风险管理[J]. 地下空间与工程学报, 2005, 1(4): 611–614. (HUANG Hong-wei, BIAN Yi-hai. Risk management in the construction of deep excavation engineering[J]. Chinese Journal of Underground Space and Engineering, 2005, 1(4): 611–614. (in Chinese))
      [6]
      黄宏伟. 隧道及地下工程建设中的风险管理研究进展[J]. 地下空间与工程学报, 2006, 2(1): 13–20. (HUANG Hong-wei. State-of-the-art of the research on risk management in construction of tunnel and underground works[J]. Chinese Journal of Underground Space and Engineering, 2006, 2(1): 13–20. (in Chinese))
      [7]
      黄宏伟, 顾雷雨. 基坑工程风险管理研究进展[J]. 岩土工程学报, 2008, 30(增刊1): 651–656. (HUANG Hong-wei, GU Lei-yu. State-of-the-art of researches on risk management of foundation pit engineering[J]. Chinese Journal of Geotechnical Engineering, 2008, 30(S1): 651–656. (in Chinese))
      [8]
      王 岩, 黄宏伟. 地铁区间隧道安全评估的层次-模糊综合评判法[J]. 地下空间, 2004, 24(3): 301–305. (WAN Yan, HUANG Hong-wei. Hierarchy-fuzzy comprehensive judgment for safety evaluation of metro running tunnel[J]. Underground Space, 2004, 24(3): 301–305. (in Chinese))
      [9]
      边亦海. 基于风险分析的软土地区深基坑支护方案选择[D]. 上海: 同济大学, 2006. (BIAN Yi-hai. Selection of supporting system of deep excavations in soft soil area based on risk analysis[D]. Shanghai: Tongji University, 2006. (in Chinese))
      [10]
      周红波, 姚 浩, 卢剑华. 上海某轨道交通深基坑工程施工风险评估[J]. 岩土工程学报, 2006, 28(增刊1): 1902–1906. (ZHOU Hong-bo, YAO Hao, LU Jian-hua. Construction risk assessment on deep foundation pits of a metro line in Shanghai[J]. Chinese Journal of Geotechnical Engineering, 2006, 28(S1): 1902–1906. (in Chinese))
      [11]
      SAATY T L. A scaling method for priorities in hierarchical structures[J]. Journal of mathematical psychology, 1977, 15(3): 234–281.
      [12]
      赵延喜, 徐卫亚. 基于AHP和模糊综合评判的TBM施工风险评估[J]. 岩土力学, 2009, 30(3): 793–798. (ZHAO Yan-xi, XU Wei-ya. Risk assessment of TBM construction for tunnels based on AHP and fuzzy synthetic evaluation[J]. Rock and Soil Mechanics, 2009, 30(3): 793–798. (in Chinese))
      [13]
      GB50652—2011城市轨道交通地下工程建设风险管理规范[S]. 北京: 光明日报出版社, 2011. (GB50652—2011 Code for risk management of underground works in urban rail transit[S]. Beijing: Guangming Daily Press, 2011. (in Chinese))
    • Cited by

      Periodical cited type(1)

      1. 汪向硕,姜爽,郭子文,赵征. 基于误差修正的LSSVM烧结主抽入口压力预测研究. 山东冶金. 2024(06): 42-45 .

      Other cited types(0)

    Catalog

      Article views PDF downloads Cited by(1)
      Related

      /

      DownLoad:  Full-Size Img  PowerPoint
      Return
      Return