Citation: | YUE Jian-yong, YAO Ji, HUANG Shao-ming. Design and practice of deep foundation pit engineering under sensitive conditions in soft soil area[J]. Chinese Journal of Geotechnical Engineering, 2011, 33(zk1): 271-277. |
[1] |
陈忠汉 , 黄书秩 , 程丽萍 . 深基坑工程 [M]. 第二版 . 北京 : 机械工业出版社 , 2002. (CHENG Zhong-han, HUNAG Shu-zhi, CHENG Li-ping. Deep excavation engineering[M]. 2nd ed. Beijing: China Machine Press, 2002. (in Chinese))
|
[2] |
陈仲颐 , 叶书麟 . 基础工程学 [M]. 北京 : 中国建筑工业出版社 , (CHENG Zhong-yi, YE Shu-lin. Foundation engineering[M]. Beijing: China Architecture and Building Press, 1997. (in Chinese))
|
[3] |
王 湧 , 岳建勇 . 主体与支护结构结合的水平支撑系统数值分析 [J]. 地下空间与工程学报 , 2005(4): 591 – 594. (WANG Yong, YUE Jian-yong. Numerical simulation of horizontal bracing system combined with substructure of main building[J]. China Journal Of Underground Space And Engineering, 2005(4): 591 – 594. (in Chinese))
|
[4] |
黄绍铭 , 高大钊 . 软土地基与地下工程 [M]. 北京 : 中国建筑工业出版社 , 2005. (HUANG Shao-ming, GAO Da-zhao. Foundation and underground engineering in soft ground[M]. Beijing: China Architecture and Building Press, 2005. (in Chinese))
|
[5] |
DB/TJ08 — 61 — 2010 基坑工程技术规范 [S]. 2010. (DB/TJ08 — 61 — 2010 Technical code for excavation engineering[S]. 2010. ( in Chinese))
|
[1] | LIU Jun, XUN Zhi-jun, YUAN Fang, GUO Zhao-xiang. Design and monitoring of foundation pit support project for pile foundation underpinning of abutment of interchange bridges[J]. Chinese Journal of Geotechnical Engineering, 2019, 41(S2): 217-220. DOI: 10.11779/CJGE2019S2055 |
[2] | XU Qian-wei, ZHU He-hua, MA Xian-feng, MA Zhong-zheng. Pile underpinning and removing technology of shield tunnels crossing through group pile foundations of road bridges[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(7): 1217-1226. |
[3] | XIE Xiao-lin, ZHAI Jie-qun, ZHANG Yu, YANG Ke, GUO Xiao-hang, JIA Jian. Design and practice of top-down method for large-scale podiumbasement excavation of Shanghai Tower[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 744-749. |
[4] | LI De-chao, QIAN Jian-gu, WU Shi-ming, LIU Guan-shui. Numerical analysis of deformation behaviors of underpinning piles during excavation[J]. Chinese Journal of Geotechnical Engineering, 2012, 34(suppl): 238-242. |
[5] | YUAN Xiang, SUN Yuyong, GONG Quanmei, ZHOU Shunhua. Deformation control of large and deep foundation pit of Shanghai Expo axis by use of top-down construction method[J]. Chinese Journal of Geotechnical Engineering, 2009, 31(7): 1127-1132. |
[6] | ZHOU Xisheng, CHEN Yukang, ZHANG Wei. Design and practice of SMW top-down construction method in deep pit[J]. Chinese Journal of Geotechnical Engineering, 2004, 26(4): 511-515. |
[7] | GAO Junhe, LIU Guonan. In situ test and construction of two-shot grouting for waterproof of man-hole-pile[J]. Chinese Journal of Geotechnical Engineering, 2003, 25(4): 479-482. |
[8] | Gu Weiping, Li Guoxiong. Analysis and design of foundation underpinning for No.1 subway Guangzhou[J]. Chinese Journal of Geotechnical Engineering, 2000, 22(1): 98-103. |
[9] | Liu Mingzhen. Pit Underpinning Employed to Re-Align Column Footings[J]. Chinese Journal of Geotechnical Engineering, 1995, 17(6): 89-95. |
[10] | Chen Guozheng. A Case History of Underpinning of Column Footing[J]. Chinese Journal of Geotechnical Engineering, 1993, 15(2): 59-67. |