LIU Li-peng, WANG Xiao-gang, DUAN Qing-wei, FU Rui-zhi, JIANG Long. Methods to cope with external water pressure of hydraulic tunnel linings in high-pressure groundwater-rich strata[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(8): 1549-1557. DOI: 10.11779/CJGE202208021
Citation: LIU Li-peng, WANG Xiao-gang, DUAN Qing-wei, FU Rui-zhi, JIANG Long. Methods to cope with external water pressure of hydraulic tunnel linings in high-pressure groundwater-rich strata[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(8): 1549-1557. DOI: 10.11779/CJGE202208021

Methods to cope with external water pressure of hydraulic tunnel linings in high-pressure groundwater-rich strata

More Information
  • Received Date: September 22, 2021
  • Available Online: September 22, 2022
  • To solve the problems of lining design and safety caused by external water pressure in water-rich strata, the monitoring results of external water pressure in several practical projects are analyzed. Based on the model test results, the relationship among the external water pressure acting on the hydraulic tunnel linings, the groundwater activity in rock mass and the drainage capacity of linings is discussed. A new type of lining structure is proposed to solve the eccentric pressure problem of the traditional composite linings which may have a higher external water pressure applying on the lining bottom. The seepage control design standard of hydraulic tunnel in water-rich strata is discussed from the perspective of seepage flow and external water pressure control. The seepage control design criterion of hydraulic tunnel in water-rich strata is then discussed from the perspective of seepage control and external water pressure control. The results show that the external water pressure of hydraulic tunnel linings is mainly controlled by the drainage capacity of lining drainage system, and is related to the groundwater activity in the surrounding rock mass. To determine the external water pressure according to the method recommended in the specification in China is not accurate. The new proposed lining structure can effectively solve the eccentric pressure problem of linings because of the limited pressure reduction range of drainage holes and the larger water pressure on the lining bottom. It is suggested that the allowable discharge of hydraulic non-pressure tunnels with the traditional composite lining structure should be 3.0 m3/(md), and the external water pressure of lining should be below 0.5 MPa. The corresponding parameters of lining drainage and shutoff structures can be determined according to these two values. The research conclusion can provide technical support for the selection of coping method for the external water pressure problem of hydraulic tunnels in water-rich strata.
  • [1]
    水工隧洞设计规范: SL 279—2016[S]. 2016.

    Specification for Design of Hydraulic Tunnel: SL 279—2016[S]. 2016. (in Chinese)
    [2]
    孙钧. 海底隧道工程设计施工若干关键技术的商榷[J]. 岩石力学与工程学报, 2006, 25(8): 1513–1521. doi: 10.3321/j.issn:1000-6915.2006.08.001

    SUN Jun. Discussion on some key technical issues for design and construction of undersea tunnels[J]. Chinese Journal of Rock Mechanics and Engineering, 2006, 25(8): 1513–1521. (in Chinese) doi: 10.3321/j.issn:1000-6915.2006.08.001
    [3]
    张有天. 隧洞及压力管道设计中的外水压力修正系数[J]. 水力发电, 1996, 22(12): 30–34. https://www.cnki.com.cn/Article/CJFDTOTAL-SLFD612.012.htm

    ZHANG You-tian. Correction factor of external water pressure in design of tunnel and penstock[J]. Water Power, 1996, 22(12): 30–34. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SLFD612.012.htm
    [4]
    王建秀, 杨立中, 何静. 深埋隧道衬砌水荷载计算的基本理论[J]. 岩石力学与工程学报, 2002, 21(9): 1339–1343. doi: 10.3321/j.issn:1000-6915.2002.09.012

    WANG Jian-xiu, YANG Li-zhong, HE Jing. Introduction to the calculation of external water pressure of tunnel lining[J]. Chinese Journal of Rock Mechanics and Engineering, 2002, 21(9): 1339–1343. (in Chinese) doi: 10.3321/j.issn:1000-6915.2002.09.012
    [5]
    王秀英, 王梦恕, 张弥. 山岭隧道堵水限排衬砌外水压力研究[J]. 岩土工程学报, 2005, 27(1): 125–127. http://manu31.magtech.com.cn/Jwk_ytgcxb/CN/abstract/abstract11570.shtml

    WANG Xiu-ying, WANG Meng-shu, ZHANG Mi. Research on regulating water pressure acting on mountain tunnels by blocking ground water and limiting discharge[J]. Chinese Journal of Geotechnical Engineering, 2005, 27(1): 125–127. (in Chinese) http://manu31.magtech.com.cn/Jwk_ytgcxb/CN/abstract/abstract11570.shtml
    [6]
    李鹏飞, 张顶立, 赵勇, 等. 海底隧道复合衬砌水压力分布规律及合理注浆加固圈参数研究[J]. 岩石力学与工程学报, 2012, 31(2): 280–288. doi: 10.3969/j.issn.1000-6915.2012.02.007

    LI Peng-fei, ZHANG Ding-li, ZHAO Yong, et al. Study of distribution law of water pressure acting on composite lining and reasonable parameters of grouting circle for subsea tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2012, 31(2): 280–288. (in Chinese) doi: 10.3969/j.issn.1000-6915.2012.02.007
    [7]
    刘招伟, 张顶立, 张民庆. 圆梁山隧道毛坝向斜高水压富水区注浆施工技术[J]. 岩石力学与工程学报, 2005, 24(10): 1728–1734. doi: 10.3321/j.issn:1000-6915.2005.10.016

    LIU Zhao-wei, ZHANG Ding-li, ZHANG Min-qing. Grouting technique for high-pressure and water-rich area in maoba syncline at Yuanliangshan tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(10): 1728–1734. (in Chinese) doi: 10.3321/j.issn:1000-6915.2005.10.016
    [8]
    刘立鹏, 汪小刚, 贾志欣, 等. 水岩分算隧道衬砌外水压力折减系数取值方法[J]. 岩土工程学报, 2013, 35(3): 495–500. http://manu31.magtech.com.cn/Jwk_ytgcxb/CN/abstract/abstract15006.shtml

    LIU Li-peng, WANG Xiao-gang, JIA Zhi-xin, et al. Method to determine reduction factor of water pressure acting on tunnel linings using water-rock independent calculation methodology[J]. Chinese Journal of Geotechnical Engineering, 2013, 35(3): 495–500. (in Chinese) http://manu31.magtech.com.cn/Jwk_ytgcxb/CN/abstract/abstract15006.shtml
    [9]
    王秀英, 王梦恕, 张弥. 计算隧道排水量及衬砌外水压力的一种简化方法[J]. 北方交通大学学报, 2004, 28(1): 8–10. https://www.cnki.com.cn/Article/CJFDTOTAL-BFJT200401003.htm

    WANG Xiu-ying, WANG Meng-shu, ZHANG Mi. A simple method to calculate tunnel discharge and external water pressure on lining[J]. Journal of Northern Jiaotong University, 2004, 28(1): 8–10. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-BFJT200401003.htm
    [10]
    宋超业, 周书明, 谭志文. 海底隧道衬砌水荷载计算[J]. 现代隧道技术, 2008, 45(增刊1): 134–138. https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD2008S1025.htm

    SONG Chao-ye, ZHOU Shu-ming, TAN Zhi-wen The calculation of water pressure action on the lining for subsea tunnel[J]. Modern Tunnelling Technology, 2008, 45(S1): 134–138. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-XDSD2008S1025.htm
    [11]
    SHIN J, ADDENBROOKE T, POTTS D. A numerical study of the effect of groundwater movement on long-term tunnel behaviour[J]. Géotechnique, 2002, 52(6): 391–403. doi: 10.1680/geot.2002.52.6.391
    [12]
    SHIN J H, POTTS D M, ZDRAVKOVIC L. The effect of pore-water pressure on NATM tunnel linings in decomposed granite soil[J]. Canadian Geotechnical Journal, 2005, 42(6): 1585–1599.
    [13]
    SHIN H S, YOUN D J, CHAE S E, et al. Effective control of pore water pressures on tunnel linings using pin-hole drain method[J]. Tunnelling and Underground Space Technology, 2009, 24(5): 555–561.
    [14]
    韩荣荣, 朱锦杰, 连煜皓. 水电站引水隧洞外水压力监测资料浅析[J]. 红水河, 2016, 35(2): 41–45. https://www.cnki.com.cn/Article/CJFDTOTAL-HSHZ201602010.htm

    HAN Rong-rong, ZHU Jin-jie, LIAN Yu-hao. Analysis of monitoring data of diversion tunnel external water pressure[J]. Hongshui River, 2016, 35(2): 41–45. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-HSHZ201602010.htm
    [15]
    侯靖. 天荒坪抽水蓄能电站高压隧洞充水试验实测资料分析[J]. 水利水电科技进展, 2009, 29(2): 27–31. https://www.cnki.com.cn/Article/CJFDTOTAL-SLSD200902010.htm

    HOU Jing. Observed data analysis of water filling test of the high-pressure tunnel in Tianhuangping Pumped-Storage Power Station[J]. Advances in Science and Technology of Water Resources, 2009, 29(2): 27–31. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SLSD200902010.htm
    [16]
    傅睿智, 郭凯, 黄鹤程, 等. 复合衬砌外水压力模型试验研究[J]. 人民长江, 2019, 50(6): 192–197. https://www.cnki.com.cn/Article/CJFDTOTAL-RIVE201906035.htm

    FU Rui-zhi, GUO Kai, HUANG He-cheng, et al. Model test study for external water pressure on composite lining[J]. Yangtze River, 2019, 50(6): 192–197. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-RIVE201906035.htm
    [17]
    蔡晓鸿. 设集中排水的水工压力隧洞含水围岩弹塑性应力分析[J]. 岩土工程学报, 1991, 13(6): 52–63. http://manu31.magtech.com.cn/Jwk_ytgcxb/CN/abstract/abstract9520.shtml

    CAI Xiao-hong. Elastoplastic stress analysis for water-bearing surrounding rock of water pressure tunnels under concentrate drainage working conditions[J]. Chinese Journal of Geotechnical Engineering, 1991, 13(6): 52–63. (in Chinese) http://manu31.magtech.com.cn/Jwk_ytgcxb/CN/abstract/abstract9520.shtml
  • Cited by

    Periodical cited type(1)

    1. 陈娟,姜命强,赵源. 基于多目标优化的动水注浆参数设计. 水利规划与设计. 2025(02): 76-79+102 .

    Other cited types(1)

Catalog

    Article views (193) PDF downloads (83) Cited by(2)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return