Citation: | KOU Xiao-qiang, YU Jian, XU Xin-wei, SONG Shen-you, GAO Chao. Settlement calculation method for sand compaction piles under water based on in-situ measurement[J]. Chinese Journal of Geotechnical Engineering, 2022, 44(5): 820-826. DOI: 10.11779/CJGE202205004 |
[1] |
林鸣, 梁桁, 刘晓东, 等. 海上挤密砂桩工法及其在港珠澳大桥岛隧工程的应用[J]. 中国港湾建设, 2012, 32(4): 72–77. https://www.cnki.com.cn/Article/CJFDTOTAL-GKGC201204022.htm
LIN Ming, LIANG Heng, LIU Xiao-dong, et al. Method for construction of offshore sand compaction piles and its application for island and tunnel project for Hongkong-Zhuhai-Macao bridge[J]. China Harbour Engineering, 2012, 32(4): 72–77. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GKGC201204022.htm
|
[2] |
TERASHI Masaaki. Design and construction of sand compaction piles[M]. Japan: Geology Engineering Society, 2009.
|
[3] |
莫景逸, 黄晋申. 挤密砂桩在海洋接岸地基加固工程中的应用[J]. 水运工程, 2009(1): 62–68. https://www.cnki.com.cn/Article/CJFDTOTAL-SYGC200901020.htm
MO Jing-yi, HUANG Jin-shen. Application of sand compacted pile for ground treatment of oceanic shore protection engineering works[J]. Port & Waterway Engineering, 2009(1): 62–68. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SYGC200901020.htm
|
[4] |
HARADA K, OHBAYASHI J. Development and improvement effectiveness of sand compaction pile method as a countermeasure against liquefaction[J]. Soils and Foundations, 2017, 57(6): 980–987. doi: 10.1016/j.sandf.2017.08.025
|
[5] |
张曦, 吴心怡, 尹海卿. 水下挤密砂桩加固机理及沉降计算方法[J]. 中国港湾建设, 2010, 30(增刊1): 148–150. https://www.cnki.com.cn/Article/CJFDTOTAL-GKGC2010S1036.htm
ZHANG Xi, WU Xin-yi, YIN Hai-qing. Reinforcing mechanism and settlement calculation method of sand compaction pile under the water[J]. China Harbour Engineering, 2010, 30(S1): 148–150. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GKGC2010S1036.htm
|
[6] |
张曦, 吴心怡, 时蓓玲, 等. 水下挤密砂桩复合地基破坏模式的离心试验研究[J]. 中国港湾建设, 2016, 36(5): 21–24. https://www.cnki.com.cn/Article/CJFDTOTAL-GKGC201605007.htm
ZHANG Xi, WU Xin-yi, SHI Bei-ling, et al. A study on failure mode of composite foundation with marine sand compaction pile by centrifugal test[J]. China Harbour Engineering, 2016, 36(5): 21–24. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GKGC201605007.htm
|
[7] |
沈才华, 王媛, 李鹤文, 等. 基于扩孔理论的挤密砂桩复合地基桩土应力比计算方法[J]. 岩土力学, 2017, 38(10): 2873–2880. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201710014.htm
SHEN Cai-hua, WANG Yuan, LI He-wen, et al. Determination of pile-soil stress ratio for compaction foundation using cavity expansion theory[J]. Rock and Soil Mechanics, 2017, 38(10): 2873–2880. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201710014.htm
|
[8] |
王延宁, 蒋斌松, 胥新伟, 等. 挤密砂桩加固水下软土大型原位载荷试验研究[J]. 岩土力学, 2015, 36(增刊1): 320–326. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX2015S1055.htm
WANG Yan-ning, JIANG Bin-song, XU Xin-wei, et al. Experiment study of underwater sand compaction pile composite ground based on in situ load test[J]. Rock and Soil Mechanics, 2015, 36(S1): 320–326. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX2015S1055.htm
|
[9] |
The Overseas Coastal Area Development Institute of Japan. Technical Standards and Commentaries for Port and Harbor Facilities in Japan[S]. 2009.
|
[10] |
张怡戈, 王娟. 外海挤密砂桩复合地基水下堆载预压加固效果监测及分析[J]. 中国港湾建设, 2015, 35(11): 20–24. https://www.cnki.com.cn/Article/CJFDTOTAL-GKGC201511008.htm
ZHANG Yi-ge, WANG Juan. Monitoring and analysis of reinforcement effect of stack preloading for sand compaction pile composite foundation in open sea[J]. China Harbour Engineering, 2015, 35(11): 20–24. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GKGC201511008.htm
|
[11] |
王延宁, 蒋斌松, 张强, 等. 沉管基础岛–隧过渡段地基处理设计及试验验证[J]. 岩石力学与工程学报, 2018, 37(增刊2): 4297–4307. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2018S2052.htm
WANG Yan-ning, JIANG Bin-song, ZHANG Qiang, et al. Foundation treatment design and experimental study for immersed tube tunnel at the island-tunnel joint part[J]. Chinese Journal of Rock Mechanics and Engineering, 2018, 37(S2): 4297–4307. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2018S2052.htm
|
[12] |
李建宇, 梁桁. 港珠澳大桥岛隧工程隧道基础沉降计算及参数选取[J]. 水运工程, 2013(7): 84–89. https://www.cnki.com.cn/Article/CJFDTOTAL-SYGC201307029.htm
LI Jian-yu, LIANG Heng. Settlement calculation method and parameters selection of tunnel foundation for island-tunnel project of HZMB[J]. Port & Waterway Engineering, 2013(7): 84–89. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-SYGC201307029.htm
|
[13] |
龚晓南. 复合地基理论及工程应用[M]. 中国建筑工业出版社, 2007: 56–57.
GONG Xiao-nan. Theory of composite foundations and engineering applications[M]. Beijing: China Architecture and Building Press, 2007: 56–57. (in Chinese)
|
[14] |
朱小军, 孔伟阳, 李文帅. 高置换率挤密砂桩模型试验与承载力计算方法研究[J]. 公路, 2017, 62(8): 1–7. https://www.cnki.com.cn/Article/CJFDTOTAL-GLGL201708001.htm
ZHU Xiao-jun, KONG Wei-yang, LI Wen-shuai. Study of model tests and calculation methods of bearing capacity on high replacement ratio sand compacted pile[J]. Highway, 2017, 62(8): 1–7. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-GLGL201708001.htm
|
[15] |
AHN J, KIM Y T. Consolidation behavior and stress concentration ratio of SCP composite ground[J]. Marine Georesources & Geotechnology, 2012, 30(1): 63–85.
|