Citation: | YANG Song-song, ZHU Xiang-xu, ZHANG Ding-wen, LI Shun, YU Peng-fei. Simplified estimation method and on-site analysis of thrust of EPB shield[J]. Chinese Journal of Geotechnical Engineering, 2021, 43(S2): 237-240. DOI: 10.11779/CJGE2021S2056 |
[1] |
王强, 谢雄耀, 黄钟晖, 等. 四线并行盾构隧道下穿火车站股道沉降特征研究[J]. 岩石力学与工程学报, 2017, 36(增刊2): 4235-4243. https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2017S2058.htm
WANG Qiang, XIE Xiong-yao, HUANG Zhong-hui, et al. Study of settlement troughs over quadruple-tube parallel shield tunnels crossing railway tracks[J]. Chinese Journal of Rock Mechanics and Engineering, 2017, 36(S2): 4235-4243. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YSLX2017S2058.htm
|
[2] |
DENG K, TANG X, WANG L, et al. On the Analysis of Force Transmission Performance for the Thrust Systems of Shield Tunneling Machines[C]//International Conference on Intelligent Robotics and Applications. Springer-Verlag, 2009.
|
[3] |
徐冲. 砂卵石地层泥水平衡盾构隧道掘进参数控制[J]. 铁道建筑, 2019, 59(2): 94-97. https://www.cnki.com.cn/Article/CJFDTOTAL-TDJZ201902023.htm
XU Chong. Control of tunnel driving parameters of slurry balance shield in sandy gravel stratum[J]. Railway Engineering, 2019, 59(2): 94-97. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TDJZ201902023.htm
|
[4] |
徐前卫. 盾构施工参数的地层适应性模型试验及其理论研究[D]. 上海: 同济大学, 2006.
XU Qian-wei. Study on the Simulated Model Test of Shield Machine’s Working Parameters Applicable to Different Stratums and Its Theoretical Investigation[D]. Shanghai: Tongji University, 2006. (in Chinese)
|
[5] |
陈仁朋, 刘源, 汤旅军, 等. 复杂地层土压平衡盾构推力和刀盘扭矩计算研究[J]. 地下空间与工程学报, 2012, 8(1): 26-32. https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201201004.htm
CHEN Ren-peng, LIU Yuan, TANG Lv-jun, et al. Research on calculation of thrust and cutter head torque on shield in complex strata[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(1): 26-32. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-BASE201201004.htm
|
[6] |
朱合华, 徐前卫, 廖少明, 等. 土压平衡盾构施工的顶进推力模型试验研究[J]. 岩土力学, 2007, 28(8): 1587-1594. doi: 10.3969/j.issn.1000-7598.2007.08.011
ZHU He-hua, XU Qian-wei, LIAO Shao-ming, et al. Experimental study on thrust force during tunnel excavation with earth pressure balance shield machine[J]. Rock and Soil Mechanics, 2007, 28(8): 1587-1594. (in Chinese) doi: 10.3969/j.issn.1000-7598.2007.08.011
|
[7] |
DENG K S, TANG X Q, WANG L P, et al. Research on characteristics of deformation in thrust system for EPB shield machines[J]. Tunnelling and Underground Space Technology, 2011, 26(1): 15-21. doi: 10.1016/j.tust.2010.06.008
|
[8] |
王洪新. 土压平衡盾构刀盘扭矩计算及其与盾构施工参数关系研究[J]. 土木工程学报, 2009, 42(9): 109-113. https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC200909018.htm
WANG Hong-xin. Calculation of cutterhead torque for EPB shield and the relationship between cutterhead torque and shield driving parameters[J]. China Civil Engineering Journal, 2009, 42(9): 109-113. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TMGC200909018.htm
|
[9] |
刘铁雄. 日本隧道标准规范(盾构篇)及解释[M]. 成都: 西南交通大学出版社, 1988.
LIU Tie-xiong. Japanese Tunnel Standard Specification (Shield Tunneling) and Interpretation[M]. Chengdu: Southwest Jiaotong University Press, 1988. (in Chinese)
|
[10] |
王明年, 张晓军, 苟明中, 等. 盾构隧道掘进全过程三维模拟方法及重叠段近接分区研究[J]. 岩土力学, 2012, 33(1): 273-279. https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201201045.htm
WANG Ming-nian, ZHANG Xiao-jun, GOU Ming-zhong, et al. Method of three-dimensional simulation for shield tunneling process and study of adjacent partition of overlapped segment[J]. Rock and Soil Mechanics, 2012, 33(1): 273-279. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-YTLX201201045.htm
|
[11] |
王承德. 顶管施工中管壁摩阻力理论公式的商榷[J]. 特种结构, 1999, 16(3): 22-25. https://www.cnki.com.cn/Article/CJFDTOTAL-TZJG199903005.htm
WANG Cheng-de. For pipe jacking construction pipe surface frictional resistance formula under discussion[J]. Special Structures, 1999, 16(3): 22-25. (in Chinese) https://www.cnki.com.cn/Article/CJFDTOTAL-TZJG199903005.htm
|